MAAD HOSPITALITY TOWERS SLOPE STABILIZATION PROJECT

MAAD HOSPITALITY TOWERS SLOPE STABILIZATION PROJECT

The execution of permanent rock bolts and shotcrete works under the Maad Hospitality Towers Project, which was signed in April 2018, continues at full speed. Within the scope of the project, a total of 24,055 m rock bolt and 21,300
Learn more
KURUÇEŞME MANDARIN ORIENTAL BOSPHORUS HOTEL PROJECT DEEP EXCAVATION AND DEEP FOUNDATION WORKS

KURUÇEŞME MANDARIN ORIENTAL BOSPHORUS HOTEL PROJECT DEEP EXCAVATION AND DEEP FOUNDATION WORKS

Within the scope of Mandarin Oriental Bosphorus Hotel Project, foundation piles and diaphragm wall works have been completed as of August 2018. Project site locates in Kuruçeşme, along the shoring line of Istanbul Bosphorus and will be the deepest and
Learn more
BAHÇEŞEHİR UNIVERSITY HIGHER  EDUCATION BUILDING PROJECT DEEP EXCAVATION WORKS

BAHÇEŞEHİR UNIVERSITY HIGHER EDUCATION BUILDING PROJECT DEEP EXCAVATION WORKS

Having started in October 2017; a total of 7,400 m² diaphragm wall works within the scope of Deep Excavation Support System of Higher Education Building of Bahçeşehir University Beşiktaş Campus has been successfully completed by using hydraulic cutter. Design of
Learn more
1915 ÇANAKKALE BRIDGE EXCAVATION SUPPORT WORKS OF EUROPEAN ANCHOR BLOCK

1915 ÇANAKKALE BRIDGE EXCAVATION SUPPORT WORKS OF EUROPEAN ANCHOR BLOCK

In May 2018, KASKTAS AS has started European Side Anchor Block Slope Stability and Excavation Works of 1915 Çanakkale Bridge which will be the longest bridge with 2023m of midspan length and is an important part of 324km long Kınalı-Tekirdağ-Çanakkale-Savaştepe
Learn more
The Filicity Residential construction foundation pile project completed successfully.

The Filicity Residential construction foundation pile project completed successfully.

The installation of preliminary test piles at the Filicity Residential construction foundation pile project in Moscow was completed in April, 2018. Within the scope of the project there are 465 no. of bored pile with a diameter of 1200 mm
Learn more
Mahall Bomonti İzmir Project completed successfully.

Mahall Bomonti İzmir Project completed successfully.

Mahall Bomonti İzmir Project, which started in July 2016, completed as of December 2017. A total of 27706 m3 barrette pile, 19814 m. bored pile, 27211 m2 diaphragm wall and 50704 m of SBMA anchors were successfully completed within the
Learn more
High Capacity Single Bore Multiple Anchor (SBMA) Technology

High Capacity Single Bore Multiple Anchor (SBMA) Technology

In the content of Ferko Line Office and Otel Project the highest capacity ground anchors were successfully completed in very soft to soft soil conditions at Kağıthane, Istanbul,  an anchor capacity of 120 ton was achieved. Moreover, this project will
Learn more
Eurasia Tunnel Project

Eurasia Tunnel Project

Within the scope of Eurasia Tunnel Project (İstanbul Strait Road Tube Crossing Project); which was opened on December 21, 2016 that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures
Learn more