1915 ÇANAKKALE BRIDGE EUROPEAN ANCHOR BLOCK EXCAVATION AND SUPPORT WORKS

1915 ÇANAKKALE BRIDGE EUROPEAN ANCHOR BLOCK EXCAVATION AND SUPPORT WORKS

The excavation works of the reinforced concrete anchor block structure on the European side of the 1915 Çanakkale Bridge, with a volume of 68,000 m³, started in May 2018. Within the content of the European Anchor Block Project, with a
Learn more
Eurasia Tunnel Project

Eurasia Tunnel Project

Within the scope of Eurasia Tunnel Project (İstanbul Strait Road Tube Crossing Project); which was opened on December 21, 2016 that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures
Learn more