SELECTED PROJECTS

KASKTAŞ has completed more than 700 projects in our 42-years history in 23 different countries. Following are some of our selected projects recently completed or currently being executed by our business lines. Please use the filters below to narrow your search.

Filter Categories
Hepsi
Current Projects
Completed Projects
Featured Projects
  • Action Development Project
    anemptytextlline
    Within the scope of the contract signed with ANT YAPI for the Office and Hotel Project Diaphragm Wall and Top-Down Bored Pile Works; 6,000 m2 of Diaphragm Wall and 2,000 m of Bored Pile works have been completed. The...
    Detaylı bilgi için...
  • Üsküdar Underground Car Park
    anemptytextlline
    Within the scope of the contract, which consists of the Hakimiyeti Milliye Bazaar and Underground Car Park Project located in Üsküdar, signed with PLT İnş. San. ve Tic. A.Ş.; there are 15,600 m2 of Diaphragm Wall and 7,000 m...
    Detaylı bilgi için...
  • Çanakkale 1915 Bridge Project / Asian Anchor Block Excavation
    anemptytextlline
    The contract for the Çanakkale 1915 Bridge Asian Anchor Block Excavation Works, which is in the scope of the Kınalı-Tekirdağ-Çanakkale-Savaştepe Highway Project, has been signed with DLSY JV in August 8th, 2018. Within the scope of the project; there...
    Detaylı bilgi için...
  • Domodedovo Airport Project
    anemptytextlline
    Within the scope of the contract, which consists of the Domodedovo Airport Reconstruction Project in Moscow, signed with ANT YAPI San. ve Tic. A.Ş.; 8,000 m of Bored Pile has been completed as Stage 1 and 2. All installations...
    Detaylı bilgi için...
  • Dimitrovsky Project
    anemptytextlline
    The contract of the MR Group Multifunctional Complex Project Bored Pile Works has been signed with ANTTEQ. The project is ongoing in Dimitrovskiy Region in Moscow. Within the scope of the project, there are 13,000 m of Bored Pile...
    Detaylı bilgi için...
  • Maad Hospitality Tower Project
    anemptytextlline
    The contract for the Maad Hospitality Tower Project, which will be built in Mecca, Saudi Arabia, has been signed in April 2018. The project consists of the rock bolt and shotcrete works which are executed on the existing slope...
    Detaylı bilgi için...
  • Iraq Dhi Qar and Samawa Combined Cycle Power Plant...
    anemptytextlline
    The contract of the Iraq Dhi Qar 750 MW Combined Cycle Power Plant Project, which consists of the installation of the bearing foundation pile, has been signed with ENKA CONSTRUCTION. Within the scope of the project; 18,000 m of...
    Detaylı bilgi için...
  • Çanakkale 1915 Bridge Project / European Anchor Block Excavation
    anemptytextlline
    The contract of the Çanakkale 1915 Bridge European Anchor Block Excavation Works has been signed with DLSY JV. Within the scope of the project which consists of Kınalı-Tekirdağ-Çanakkale-Savaştepe Highway; there are 5,400 m of Secant Pile; 9,500 m of...
    Detaylı bilgi için...
  • King Abdulaziz Roadway Project
    anemptytextlline
    King Abdulaziz Roadway Project, whose construction is ongoing in the Mecca, Saudi Arabia, consists of the construction of a new bridge that is connected to the Jeddah-Mecca Motorway. Within the scope of the project; 300 m of Bored Pile...
    Detaylı bilgi için...
  • Filicity Project
    anemptytextlline
    The contract of Multifunctional Residence Project Bored Pile Works, signed with ESTA CONSTRUCTION; 11,000 m of Bored Pile with Ø 120 cm diameter has been completed. The project, whose construction is still ongoing, is located in Bagrationovskaya Region, Moscow.Project...
    Detaylı bilgi için...
  • Krasnopresnenskaya Project
    anemptytextlline
    Within the scope of the contract signed with OOO BOES CONSTRUCTION for the Multifunctional Complex Project Bored Pile Works; 16,500 m of Bored Pile with Ø 88-100 cm diameters has been completed. The project is located in the Krasnopresnenskaya...
    Detaylı bilgi için...
  • Multi-storey Car Park Project
    anemptytextlline
    The contract for the Multi-storey Car Park Project, which is located in MIBC Moscow-City Ring 3 Transportation Road, has been signed with ENKA CONSTRUCTION. Within the scope of the project; 3,500 m of Bored Pile with Ø 62 cm...
    Detaylı bilgi için...
  • Shelepihinskaya Project
    anemptytextlline
    The contract for the Multifunctional Residence and Facility Complex, located in Moscow, has been signed with ANT YAPI. Within the scope of the project; 8,500 m of Bored Pile with Ø 100-150 cm diameters has been completed.Project DescriptionShelepihinskaya Project...
    Detaylı bilgi için...
  • Mandarin Oriental Bosphorus Hotel Project
    anemptytextlline
    Mandarin Oriental Bosphorus Project Shoring and Foundation Works is an ESTA Gayrimenkul investment and the contract has been signed with Yapı Merkezi. Within the scope of the project; there are 21,600 m2 of Diaphragm Wall; 6,000 m of Pre-stressed...
    Detaylı bilgi için...
  • Michurinsky Bored Pile Project
    anemptytextlline
    Within the scope of the Michurinsky residency project in Moscow, there are 15,000 m of Bored Pile. The piles to be made have the following properties:After the concrete is poured into each pile, a precast concrete pile will be...
    Detaylı bilgi için...
  • Bahçeşehir University Education Building Project
    anemptytextlline
    A total of 7000 m2 diaphragm wall and 700 m2 baretta pile was constructed within the scope of Bahçeşehir University Education Building Project, which was started in October 2017. The project site in Besiktas is next the shoring line...
    Detaylı bilgi için...
  • Ferko Line Office and Hotel Project
    anemptytextlline
    The shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to...
    Detaylı bilgi için...
  • Mahall Bomonti İzmir Project
    anemptytextlline
    The Mahall Bomonti İzmir Project under construction is located at Bayraklı region in  İzmir. The deep foundation system and shoring design of Mahall Bomonti İzmir Project; which has a maximum 20 m of excavation depth and partially under ground...
    Detaylı bilgi için...
  • Riyadh Metro Project Piling and Shoring Works
    anemptytextlline
    Riyad Metro - Line Number 3Within the content of the Riyad Metro Project, one of the largest construction projects currently in progress in Saudi Arabia, bored piles with 120 cm and 150 cm diameter in the Western Stretch region...
    Detaylı bilgi için...
  • Jabal Al Ka’aba Project Phase 2
    anemptytextlline
    Within the scope of Mecca Development Project Phase-1 of Jabal Al Ka'aba Project was completed between 2003 and 2004. Besides slope stability project of the rock stabilization works in Phase 2 of the Jabal Al Ka'aba Project was also...
    Detaylı bilgi için...
  • Alarko Kabataş Construction Site, Shoring Works of NATM, TBM...
    anemptytextlline
    Within the scope of Kabataş-Mecidiyeköy-Mahmutbey Subway Project, shoring works of NATM, TBM and Turnout shaft in Kabataş, Istanbul has been carried out. The excavation depth of these three shafts vary between 43.10 m to 45.4 m and they are...
    Detaylı bilgi için...
  • İzmir Aliağa Star Refinery Projects
    anemptytextlline
    İzmir Aliağa Star Refinery ProjectsWithin the scope of İzmir Aliağa Refinery Project; which is the largest private sector investment project in Turkey, several sub-contract works have been carried out under different main contractors.Under these subcontracts; Terrace 5&6 Permanent SBMA...
    Detaylı bilgi için...
  • Mecca Holy Haram Development Project
    anemptytextlline
    The increasing number of pilgrims, Mecca receives, has necessitated expansion of the Holy Mosque (Al Masjid Al Haram), as well as development projects located in the holy sites and several high-rise tower projects to accommodate the greater influx.Since its...
    Detaylı bilgi için...
  • Eurasia Tunnel - Istanbul Strait Road Tube Crossing Project
    anemptytextlline
    Within the scope of Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures called as transition boxes and...
    Detaylı bilgi için...
  • New Ashgabat International Airport
    anemptytextlline
    The new Ashgabat International airport was built to replace existing airport facilities in order to respond to the rapidly growing domestic and international passenger traffic in Turkmenistan. Within the scope of the project, its main contractor was Polimeks, 120,000...
    Detaylı bilgi için...
  • Moscow International Business Center
    anemptytextlline
    Moscow City, or the Moscow International Business Center by its full name, is situated four kilometers west of the Kremlin on Krasnopresnenskaya (an embankment of the Moscow River), and is one of the largest and most ambitious construction projects....
    Detaylı bilgi için...
  • Eroğlu Sykland Project
    anemptytextlline
    Skyland Project consists of 3 number of tower (Offices, Residences and Hotel) and a shopping with wellness center. This is the deepest excavation project with its 76 m depth supported with anchors not only in Europe but also in...
    Detaylı bilgi için...
  • NEF Projects
    anemptytextlline
    NEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed.  Within the content of NEF 11 Project 5,500...
    Detaylı bilgi için...
  • Western High Speed Diameter Motorway Project
    anemptytextlline
    St. Petersburg Western High-Speed Diameter Motorway Project is one of the most important public-private partnership (PPP) agreement realized in Russia up to now. Within the scope of the Project a series of bridges combining the islands and a 47 km...
    Detaylı bilgi için...
  • İzmit Bay Suspension Bridge Project
    anemptytextlline
    Osman Gazi Bridge ProjectsWithin the scope of the Osman Gazi Bridge Project; 4 different works; such as diaphragm wall works at South Anchorage Block and South Approach Viaducts, sheet pile driving and extracting works at Dry Dock, soil improvement...
    Detaylı bilgi için...
  • 4×125 Najybia Gas Turbine Power Plant
    anemptytextlline
    Najybia Power Plant Project was successfully completed by ENKA. The project, located near Basrah, is part of a master plan developed and implemented by Republic of Iraq’s Ministry of Electricity to increase the power generation capacity to meet the...
    Detaylı bilgi için...
  • Metropol Ataşehir Project
    anemptytextlline
    2,650 m Barette piles were constructed within the content of the Metropol Istanbul Project, one of the highest buildings in Europe with a 250-meter skyscraper.Project DescriptionMetropol Ataşehir Project EngineeringProject Features Client Varyap GAP Key Quantities Barette Pile2,650 m Project Duration Start Date01.06.2013Finish Date01.10.2013Duration4 Months LocationIstanbul, Turkey   ...
    Detaylı bilgi için...
  • Kuntsevo Multifunctional Trade & Business Center
    anemptytextlline
    Kuntsevo Multifunctional Trade & Business Center was built in Moscow with an area of  26,800 m2. The 25 m deep excavation pit was performed by a deep shoring system consisting of 45 m deep and D=80 cm diaphragm wall...
    Detaylı bilgi için...
  • Jeddah Storm Water Drainage Project
    anemptytextlline
    This project was designed in order to control and divert storm water towards to the sea. The whole project consists of 8 Packages with 5 Dams and 3 Channels/Drainage and outfalls. The New Drainage system runs at a stretch...
    Detaylı bilgi için...
  • Ford Otosan Automobile Plant
    anemptytextlline
    Within the scope of Ford Otosan Automobile Factory in Gölcük, bored piles, jet grout columns and stone columns were successfully executed under the foundations of the different strcutures. 13 months after the project started; in other words when 90%...
    Detaylı bilgi için...
  • Metro Bank Project
    anemptytextlline
    A total of 18,285 m2 Diaphragm Wall, 3,150 m Grout Drilling and 90 m3 Grouting works were completed within the content of the Metrobank, one of the biggest banks of the Russian Federation, Project.Project DescriptionMetro Bank Project EngineeringProject Features Client Alto-Assets Key...
    Detaylı bilgi için...
  • Kashagan Oil Field Development
    anemptytextlline
    The Kashagan field is located in the Kazakhstan sector of the Caspian Sea and extends over a surface area of approximately 75 kilometers by 45 kilometers. The reservoir lies some 4,200 meters below the shallow waters of the northern part of...
    Detaylı bilgi için...
  • İzmit Tüpraş Refinery Upgrading Projects
    anemptytextlline
    Within the scope of Izmit Tüpraş Refinery Upgrading Projects, soil improvement works were completed under 5 different Employers. Between 2011 and 2012, a total of 162,000 m Jet Grout, 21,500 m Foundation Piles and 3,800 m Barette Piles were...
    Detaylı bilgi için...
  • Multi-Purpose Public Buildings in Smolenskaya
    anemptytextlline
    Diaphragm wall with a thickness of 600 mm and 1,000 mm diameter top-down bored pile construction works were successfully completed within the scope of the Smolenskaya Multi-Purpose Public Building Project; which consists of a 12-storey shopping center and office...
    Detaylı bilgi için...
  • Lamar Towers
    anemptytextlline
    The Lamar Towers in Jeddah; which is 50 m away from the Red Sea; consist of two multi functional towers and will be one of the tallest buildings in Jeddah at a 335 m height. The podium structure consists...
    Detaylı bilgi için...
  • Levent Zorlu Project
    anemptytextlline
    Four (4) different shoring systems of Zorlu Levent Project with 20 m to 27 m excavation depth were designed by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding structures...
    Detaylı bilgi için...
  • Borusan Gemlİk Projects
    anemptytextlline
    A total of 21,860 m of bored piles and 17,780 m of DSM Columns were installed at the Bursa Gemlik ERW Pipe Plant of Borusan Mannesmann. Also within the scope of Gemlik Port Facilities Renovation and Consolidation Project 34,000...
    Detaylı bilgi için...
  • Al Jawhara Tower Project
    anemptytextlline
    The 40-storey Al Jawhara Tower; which is located on the Corniche Road in Jeddah; consists of luxurious penthouses and apartments. A total of 3,600 m, 60 cm and 80 cm diameter secant piles; 10,750 m 90 cm and 120...
    Detaylı bilgi için...
  • White Garden Project
    anemptytextlline
    The White Garden Project, whose client is Ant Yapı, consists of 2 number of office buildings and it was planned as the continuation of the White Square Project. Within the scope of the project, 272 Top Down pile were...
    Detaylı bilgi için...
  • Vyborg Compressor Station
    anemptytextlline
    In the content of Nord Stream Project of Gazprom 6,500 m bored piles constructed. The city of Vyborg was built on a volcanic structure, which makes the project important. Massive granite and granodiorite type rocks were observed throughout the...
    Detaylı bilgi için...
  • Tula Cement Factory
    anemptytextlline
    The Tula Cement Plant belonging to Heidelberg Cement was located in Tula, Russia. Under the main contactor Betatek, KASKTAŞ successfully completed a total of 37,000 m of bored piles with various diameter and length. Before execution of piles, a...
    Detaylı bilgi için...
  • Algeria Motorway Project
    anemptytextlline
    This motorway is a major national project being undertaken by the Algerian government. Traversing the country, the motorway will stretch from the Tunisian border in the east to the Moroccan border in the west, for a total distance of...
    Detaylı bilgi için...
  • Albanian Motorway Project
    anemptytextlline
    Albanian Motorway Project was undertaken by Enka and Bechtel in September, 2006. The Rreshen-Kalimash Motorway Project is a key connection between Durres Port, Albania’s primary harbor on the Adriatic Sea, and Kosovo. The Rreshen-Kalimash motorway’s main purpose is to...
    Detaylı bilgi için...
  • Paveletskaya Underground Complex
    anemptytextlline
    Paveletskaya Square Project is an underground trade center to be built on the Paveletskaya square of Moscow city center. Our company has undertaken the construction of diaphragm wall, bored pile and ground improvement works within the content of the...
    Detaylı bilgi için...
  • Tuzla Sedef Shipyard
    anemptytextlline
    In this project, where the employer is Sedef Gemi İnşaat, a total of 168,000 m Jet Grout Column and 35,000 m Bored Pile were installed in Tuzla Sedef Shipyard between 2005-2008.Project DescriptionTuzla Sedef Shipyard EngineeringProject Features Client Sedef Gemi İnşaat Key Quantities Bored...
    Detaylı bilgi için...
  • On-Shore Processing Facility, Sakhalin Island
    anemptytextlline
    On the northeastern coast of Sakhalin Island in the Russian Federation, a total of 100,000 m of 500-600 mm diameter bored pile and 2,000 m2 of sheet pile wall were executed in three phases at the On-shore Processing Facility...
    Detaylı bilgi için...
  • Tsvetnoy Multifunctional Complex
    anemptytextlline
    In Tsvetnoy Project, a local subcontractor was started geotechnical works. However, due to the excessive unpredictable displacements encountered, KASKTAŞ was involved in the Project. Within the content of the remedial measures, a total of 550 m steel pipe pile,...
    Detaylı bilgi için...
  • Medina Central Area Development Project
    anemptytextlline
    Since the middle of the 1980s the Prophet’s Mosque (Masjid Al Haram Al Sharif, Masjid An-Nabawi) in Medina has been expanded with the area around the mosque developed by The Medina Central Area Development Project. In accordance with this...
    Detaylı bilgi için...
  • Jeddah King Abdul Aziz International Airport
    anemptytextlline
    The project, located within King Abdul Aziz Airport area, includes the expansion of existing domestic and international passenger terminals. Bored pile installation works were completed in two different sites, the north and south terminals.Project DescriptionJeddah King Abdul Aziz International...
    Detaylı bilgi için...
  • Shakhtar Donetsk Stadium
    anemptytextlline
    The new Stadium, located in Leninsky Komsomol Park, Donetsk, home of FC Shakhtar and is the first stadium in Ukraine to aspire to UEFA and FIFA 5-star status with seating capacity for 50,000 spectators. The project has seen the...
    Detaylı bilgi için...
  • Mirax Plaza
    anemptytextlline
    A total of 11,000 m of bored piles; varying from 1,000-1,200 mm diameter were installed at the Mirax Plaza Project. This project consists of the construction of two high-rise buildings, 41 and 47 stories tall. The piling works began...
    Detaylı bilgi için...
  • White Square Office Center Project
    anemptytextlline
    The White Square Office Center, whose client was the AIG Lincoln-Coalco Partnership,   consists of 3 office buildings near the Belaruskaya Subway Station and covers a total construction area of 109,000 m2. A total of 4,700 m of bored pile...
    Detaylı bilgi için...
  • Esentai Park - Tower Building
    anemptytextlline
    Esentai Park Project covers, soil improvement by using jet grout columns of foundations of the tower; anchor and rock bolt installation works and shotcreting wokrs for the execution of the excavation pit. ENKA was the employer of the project...
    Detaylı bilgi için...
  • Aramco Rabigh Development Project
    anemptytextlline
    In the content of Aramco Rabigh Development Project, a total of 22,000 m bore pile and 51,000 m stone column installation works were successfully completed.Project DescriptionARAMCO Rabigh Development Project EngineeringProject Features Client Consolidated Contractors Company Key Quantities Bored Pile22,000 mStone Column51,000 m Project Duration Start...
    Detaylı bilgi için...
  • Four Seasons Bosphorus Hotel
    anemptytextlline
    For the excavation of foundation excavation pit for the Four Seasons Bosphorus Hotel, located very close to Istanbul Bosphorus, an anchored piled wall shoring system was implemented with a depth of 18 m. In order to provide impermeability of...
    Detaylı bilgi için...
  • Oued Athmania Dam Project
    anemptytextlline
    Within the scope of the Oued Athmania Dam Project in Mila, 11,000 m of 650 mm diameter jet grout columns were performed, within the dam construction works, a total of 35,050 m of drilling for grouting and drainage, 5,300...
    Detaylı bilgi için...
  • Tengiz & Munay Daria Projects
    anemptytextlline
    A total of 17,000 m reinforced concrete precast driven pile and 27,500 m2 sheet piles were driven by executed by KASKTAŞ.Project DescriptionTengiz & Munay Daria Projects EngineeringProject Features Client Munay Daria Key Quantities R.C. Driven Pile17,000 mSheet Pile27,500 m2 Tie Rods Installation94 no. Project...
    Detaylı bilgi için...
  • C&WP Topside Project
    anemptytextlline
    This project consists of the modernization and strengthening of quayside works; where petroleum platforms will be constructed. Ground improvement by stone column method was implemented under the unloading berth area; where extremely high loads were placed. In addition to...
    Detaylı bilgi için...
  • Artvin Deriner Dam
    anemptytextlline
    The 670 MW Deriner Dam, located on the Çoruh River in the Eastern Black Sea Region, is the largest dam in Turkey and the fifth largest concrete dam in the world with a height of    247 m. Construction of...
    Detaylı bilgi için...
  • Poti Port Petroleum Products Storage and Handling Terminal Project
    anemptytextlline
    The Poti Sea Port is a major seaport and harbor of the eastern Black Sea coast at the mouth of the Rioni River in Poti, Georgia. 11,000 m Stone Column installation completed successfully by Kasktaş as a subcontractor of...
    Detaylı bilgi için...
  • Mostar Bridge
    anemptytextlline
    The historical Mostar Bridge collapsed on November 9, 1993 as a result of bombing during the civil war in the former state of Yugoslavia. Reconstruction of the bridge and the historical environment were performed under the supervision of the...
    Detaylı bilgi için...
  • Jeddah Hilton Hotel
    anemptytextlline
    Located on the Corniche Road in Jeddah, this project consists of a hotel building, function hall and apartment blocks constructed between 1995 and 2001. A total of 36,000 m of 100 cm diameter skin and base grouted bored piles...
    Detaylı bilgi için...
  • Aktau Port Rehabilitation Project
    anemptytextlline
    Aktau is Kazakhstan's main port on the Caspian Sea and serves as the major logistics base for the offshore oil fields. The ENKA-Bechtel joint venture signed the contract with Kazakhstan's Ministry of Transportation for the Aktau Port rehabiliation project....
    Detaylı bilgi için...