Ferko Line Office and Hotel Project

Ferko Line Office and Hotel Project

The shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding
Learn more
Alarko Kabataş Construction Site, Shoring Works of NATM, TBM and Turnout Shaft

Alarko Kabataş Construction Site, Shoring Works of NATM, TBM and Turnout Shaft

Within the scope of Kabataş-Mecidiyeköy-Mahmutbey Subway Project, shoring works of NATM, TBM and Turnout shaft in Kabataş, Istanbul has been carried out. The excavation depth of these three shafts vary between 43.10 m to 45.4 m and they are very
Learn more
Eurasia Tunnel – Istanbul Strait Road Tube Crossing Project

Eurasia Tunnel – Istanbul Strait Road Tube Crossing Project

Within the scope of Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures called as transition boxes and prepared
Learn more
NEF Projects

NEF Projects

NEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed.  Within the content of NEF 11 Project 5,500 m
Learn more
Metropol Ataşehir Project

Metropol Ataşehir Project

2,650 m Barette piles were constructed within the content of the Metropol Istanbul Project, one of the highest buildings in Europe with a 250-meter skyscraper.    
Learn more
Levent Zorlu Project

Levent Zorlu Project

Four (4) different shoring systems of Zorlu Levent Project with 20 m to 27 m excavation depth were designed by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding structures and
Learn more
Tuzla Sedef Shipyard

Tuzla Sedef Shipyard

In this project, where the employer is Sedef Gemi İnşaat, a total of 168,000 m Jet Grout Column and 35,000 m Bored Pile were installed in Tuzla Sedef Shipyard between 2005-2008.    
Learn more
Four Seasons Bosphorus Hotel

Four Seasons Bosphorus Hotel

For the excavation of foundation excavation pit for the Four Seasons Bosphorus Hotel, located very close to Istanbul Bosphorus, an anchored piled wall shoring system was implemented with a depth of 18 m. In order to provide impermeability of shoring
Learn more