Ferko Line Office and Hotel Project

Ferko Line Office and Hotel Project

The shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding
Learn more
İzmir Aliağa Star Refinery Projects

İzmir Aliağa Star Refinery Projects

Within the scope of İzmir Aliağa Refinery Project; which is the largest private sector investment project in Turkey, several sub-contract works have been carried out under different main contractors. Under these subcontracts; Terrace 5&6 Permanent SBMA Anchor Works, Terrace 7
Learn more
Eurasia Tunnel – Istanbul Strait Road Tube Crossing Project

Eurasia Tunnel – Istanbul Strait Road Tube Crossing Project

Within the scope of Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures called as transition boxes and prepared
Learn more
New Ashgabat International Airport

New Ashgabat International Airport

The new Ashgabat International airport was built to replace existing airport facilities in order to respond to the rapidly growing domestic and international passenger traffic in Turkmenistan. Within the scope of the project, its main contractor was Polimeks, 120,000 m
Learn more
NEF Projects

NEF Projects

NEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed.  Within the content of NEF 11 Project 5,500 m
Learn more
İzmit Bay Suspension Bridge Project

İzmit Bay Suspension Bridge Project

Within the scope of the Osman Gazi Bridge Project; 4 different works; such as diaphragm wall works at South Anchorage Block and South Approach Viaducts, sheet pile driving and extracting works at Dry Dock, soil improvement by jet grouting at
Learn more
Jeddah Storm Water Drainage Project

Jeddah Storm Water Drainage Project

This project was designed in order to control and divert storm water towards to the sea. The whole project consists of 8 Packages with 5 Dams and 3 Channels/Drainage and outfalls. The New Drainage system runs at a stretch of
Learn more
Ford Otosan Automobile Plant

Ford Otosan Automobile Plant

Within the scope of Ford Otosan Automobile Factory in Gölcük, bored piles, jet grout columns and stone columns were successfully executed under the foundations of the different strcutures. 13 months after the project started; in other words when 90% of
Learn more
İzmit Tüpraş Refinery Upgrading Projects

İzmit Tüpraş Refinery Upgrading Projects

Within the scope of Izmit Tüpraş Refinery Upgrading Projects, soil improvement works were completed under 5 different Employers. Between 2011 and 2012, a total of 162,000 m Jet Grout, 21,500 m Foundation Piles and 3,800 m Barette Piles were installed
Learn more
Borusan Gemlİk Projects

Borusan Gemlİk Projects

A total of 21,860 m of bored piles and 17,780 m of DSM Columns were installed at the Bursa Gemlik ERW Pipe Plant of Borusan Mannesmann. Also within the scope of Gemlik Port Facilities Renovation and Consolidation Project 34,000 m
Learn more