Riyadh Metro Project Piling and Shoring Works

Riyadh Metro Project Piling and Shoring Works

Within the content of the Riyad Metro Project, one of the largest construction projects currently in progress in Saudi Arabia, bored piles with 120 cm and 150 cm diameter in the Western Stretch region viaducts were completed. The project is
Learn more
Eroğlu Sykland Project

Eroğlu Sykland Project

Skyland Project consists of 3 number of tower (Offices, Residences and Hotel) and a shopping with wellness center. This is the deepest excavation project with its 76 m depth supported with anchors not only in Europe but also in the
Learn more
Levent Zorlu Project

Levent Zorlu Project

Four (4) different shoring systems of Zorlu Levent Project with 20 m to 27 m excavation depth were designed by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding structures and
Learn more