Son 20 yılda gerçekleştirilen bazı önemli ve seçkin projelerimizin listesi…


No
Company
Project Title                                          
Business Line                       
Sub Business Line
Continent
Country
Location
Start Date   
Finish Date
Client
Main Key Quantities
110KASKTAŞRiyadh Metro Project Piling and Shoring WorksPiling and Shoring WorksDeep Foundation, Slope StabilityAsiaSaudi ArabiaRiyadh13.10.201501.07.2017Fast Consortium, Ar Riyadh New MobilityMicro Pile: 9.650 m, Bored Pile:7.950 m, Bar Anchor: 185 m, Anchor: 15.300 m, Rock Bolt 1.850 m, Shotcrete: 9.350 m2
109KASKTAŞTSGI Cofferdam Bracing Options Piling WorksPiling WorksDeep FoundationEurasiaTurkeyİzmir06.10.201614.01.2017TSGI MühendislikBored Pile: 5.690 m
108KASKTAŞMahall Bomonti İzmir ProjectShoring and Excavation Works,Piling WorksDeep Foundation, Deep Excavation, Special ApplicationEurasiaTurkeyİzmir01.05.201601.09.2017Türkerler ConstructionBarette Pile:27.055 m3 , Bored Pile: 6.411 m, Diaphragm Wall: 27.091 m2, SBMA Anchor: 67.170 m
107KASKTAŞAlarko Kabataş Construction Site, Shoring Works of NATM, TBM and Turnout ShaftShoring WorksDeep ExcavationEurasiaTurkeyIstanbul01.07.201628.12.2016Alarko Contracting GroupBored Pile: 5.405 m
106KASKTAŞKuruçeşme Mandarin Oriental Bosphorus Hotel ProjectShoring and Excavation WorksDeep Excavation, Deep Foundation, Soil ImprovementEurasiaTurkeyIstanbul01.04.201601.07.2017Yapı MerkeziDiaphragm Wall: 22.245 m2, Anchor: 2.400 m, Top Down Bored Pile: 4.634 m, Steel Strut: 1.444 ton, Foundation Pile: 16.068 m, Jet Grout: 9.200 m, Unreinforced Secant Pile: 6.440 m
105KASKTAŞFerko Line Office and Hotel ProjectShoring and Excavation WorksDeep Excavation, Deep Foundation, Soil ImprovementEurasiaTurkeyIstanbul01.05.201601.02.2017Ferko ConstructionBored Pile: 33.152 m, Diaphragm Wall: 12.451 m2 ,Jet Grout: 68.928 m, SBMA Anchor: 8.918 m
104KASKTAŞİzmir Aliağa STAR Refinery - Piling WorksPiling WorksDeep FoundationEurasiaTurkeyİzmir16.01.201629.10.2016Es İnşaatPiling Works: 29.200 m
103KASKTAŞSheet Piling WorksSheet Piling WorksDeep ExcavationAsiaIraqBaghdad01.12.201501.06.2016ENKA İnşaat ve Sanayi A.Ş.Sheet Pile: 6.624 m2
102KASKTAŞİzmir Aliağa STAR Refinery - Remedial WorksRemedial Works, Permanent AnchorageSlope Stability, Special ApplicationEurasiaTurkeyİzmir01.11.201401.02.2017Yenigün ConstructionSBMA Anchor: 27.320 m , Anchor: 5.050 m, Soil Nail: 27.600 m, Sub-Horizontal & Passive Drains: 5.330 m
101KASKTAŞJabal Al Kaba - Phase 2Anchorage WorksSlope StabilityAsiaSaudi ArabiaMakkah10.09.201401.03.2016Abdul Latif Jameel Real Estate (ALJ)Anchor Works: 12.000 m, Rock Bolt: 13.000 m, Shotcrete: 10.500 m
100KASKTAŞEurasia Tunnel - Yenikapı Underpass and U-Turn Structures Geotechnical WorksYenikapı U-Turn & Pedestrian Bridge Diaphragm Walls, Soil Improvement Works and Bi-directional Static Load TestDeep Excavation, Deep Foundation, Soil ImprovementEurasiaTurkeyIstanbul01.05.201501.01.2016Yapı Merkezi & SK Engineering JVBarette Pile: 12.700 m2, Diaphragm Wall: 14.850 m2 ,Jet Grout: 111.500 m
99KASKTAŞMoscow US Embassy ProjectExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.10.201401.09.2015ENKA İnşaat ve Sanayi A.Ş.Secant Pile: 3.800 m, Anchor: 1.000 m
98KASKTAŞAvtozavodskaya ProjectExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.07.201501.09.2015Titan Demontaj StroyDiaphragm Wall: 3.450 m2
97KASKTAŞPetkim Container Port Backyard and Breakwater Construction WorksPermanent Anchor WorksSpecial ApplicationEurasiaTurkeyİzmir01.01.201501.09.2015Es İnşaatSingle Bore Multiple Anchor (SBMA): 8.870 m
96KASKTAŞİzmir Aliağa STAR Refinery - Piling WorksPiling WorksDeep FoundationEurasiaTurkeyİzmir01.01.201512.08.2015TSGI MühendislikPiling Works: 37.900 m, 2.000 m Berliner Wall
95KASKTAŞEurasia Tunnel - Eyüp Aksoy Cut&Cover Tunnels Excavation Support System Works Phase 2Koşuyolu Eyüp Aksot Cut & Cover Tunnels Piling Works 2nd PhaseDeep FoundationEurasiaTurkeyIstanbul01.07.201501.09.2015Yapı Merkezi & SK Engineering JVBored Pile: 1.950 m
94KASKTAŞJabal Omar DevelopmentAnchorage WorksSlope StabilityAsiaSaudi ArabiaJeddah01.08.201101.09.2015Jabal Omar Development CompanyAnchor: 60.500 m, Rock Bolt: 10.000 m
93KASKTAŞFirst Ring RoadAnchorage WorksSlope StabilityAsiaSaudi ArabiaMakkah01.03.201301.09.2015Saudi Bin Ladin Group / Dar Al HandasahPermanent Anchor: 17.500 m, Rock Bolt: 12.000 m, Shotcrete: 17.000 m2
92KASKTAŞKing Faisal Specialist HospitalPiling WorksDeep FoundationAsiaSaudi ArabiaJeddah01.05.201401.08.2015Saudi Bin Ladin GroupBored Pile: 30.000 m
91KASKTAŞAbraj KuadiAnchorage WorksSlope StabilityAsiaSaudi ArabiaMakkah01.06.201301.08.2015Saudi Bin Ladin GroupAnchor: 10.000 m, Permanen Anchor: 36.000 m, Soil Nail: 20.000 m, Secant Pile: 10.800 m
90KASKTAŞEurasia Tunnel - European Transition Box (ETB) Excavation Support System WorksEuropean Transition Box & Cut-Cover & U-Section Diaphragm Wall, Piling and Soil Improvement WorksDeep Excavation, Soil ImprovementEurasiaTurkeyIstanbul01.03.201430.05.2015Yapı Merkezi & SK Engineering JVSecant Pile: 19.500 m, Diaphragm Wall: 45.000 m2, Jet Grout: 14.700 m
89KASKTAŞEurasia Tunnel - Kazlıçeşme U Turn Structures Piling Works Phase 1Kazlıçeşme U Turn Structures Piling Works Phase 1Deep FoundationEurasiaTurkeyIstanbul01.02.201501.04.2015Yapı Merkezi & SK Engineering JVBored Pile: 1.922 m
88KASKTAŞEurasia Tunnel - Kazlıçeşme U Turn Structures Piling Works Phase 2Kazlıçeşme U Turn Structures Piling Works Phase 2Deep FoundationEurasiaTurkeyIstanbul01.01.201601.05.2016Yapı Merkezi & SK Engineering JVBored Pile: 1.918 m
87KASKTAŞPlot 17-18 Multi-Purpose Residential ComplexShoring and Excavation WorksDeep ExcavationEurasiaRussian FederationMoscow01.08.201301.02.2015ZAO Renaissance ConstructionDiaphragm Wall: 10.325 m2, Anchor: 25.937 m, Bored Pile: 5.410 m
86KASKTAŞNew Ashgabat International AirportSoil Improvement WorksSoil ImprovementAsiaTurkmenistanAshgabat01.03.201301.02.2014Polimeks ConstructionStone Column: 98.500m, Jet Grout: 162.000 m
85KASKTAŞMulti-Purpose Residental Complex in Skolkovo DistrictPiling WorksDeep FoundationEurasiaRussian FederationMoscow01.08.201401.02.2015AO ProkonsBored Pile: 4.284 m
84KASKTAŞEroğlu Sykland ProjectExcavation Support SystemDeep ExcavationEurasiaTurkeyIstanbul01.02.201301.01.2015Eryap Mühendislik ve İnşaatBored Pile: 18.000 m, Mini Pile: 18.540 m, Soil Nail: 11.700 m, Shotcrete: 11.500 m2, Anchor: 266.000 m
83KASKTAŞNEF 03Excavation Support SystemDeep Excavation, Deep Foundation, Soil ImprovementEurasiaTurkeyIstanbul01.02.201401.11.2014Global Gayrimenkul, NEFAnchor: 5.020 m, Jet Grout: 22.355 m, Foundation Pile: 13.190 m, Diaphragm Wall: 5.700 m2,
82KASKTAŞNEF 163Anchorage WorksDeep ExcavationEurasiaTurkeyIstanbul01.03.201001.06.2010Global Gayrimenkul, NEFAnchor: 4.407 m, Soil Nail: 350 m
81KASKTAŞNEF 11Excavation Support SystemDeep ExcavationEurasiaTurkeyIstanbul01.06.201001.08.2010Global Gayrimenkul, NEFBored Pile: 11.875 m, Soil Nail: 5.274 m
80KASKTAŞWestern High Speed Diameter Motorway ProjectPiling WorksDeep Excavation, Deep FoundationEurasiaRussian FederationSt. Petersburg01.04.201301.07.2014Ica Astaldi İçtaş WHSD ConstructionFoundation Pile: 48.000 m, Diaphragm Wall: 65.850 m2
79KASKTAŞEurasia Tunnel - Asian Transition Box (ATB) Excavation Support System WorksExcavation Supoort System Construction Works for ATBDeep ExcavationEurasiaTurkeyIstanbul01.12.201201.03.2014Yapı Merkezi & SK Engineering JVSecant Pile: 10.500 m, Bored Pile: 10.200 m, Anchor Works: 83.200 m, Rock Bolts: 10.200 m, Excavation: 137.000 m3
78KASKTAŞEurasia Tunnel - Eyüp Aksoy Cut&Cover Tunnels Excavation Support System Works Phase 1Eyüp Aksoy Cut&Cover Tunnels Excavation Support System Works Phase 1 & 2Deep ExcavationEurasiaTurkeyIstanbul01.06.201301.02.2014Yapı Merkezi & SK Engineering JVBored Pile: 7.500 m
77KASKTAŞİzmit Bay Suspension Bridge - South Anchor BlockExcavation Support SystemSpecial ApplicationEurasiaTurkeyYalova01.01.201301.02.2014STFA ConstructionDiaphragm Wall: 14.000 m2
76KASKTAŞ4×125 Najybia Gas Turbine Power PlantPiling WorksDeep FoundationAsiaIraqBasrah01.01.201301.02.2014ENKA TeknikBored Pile: 67.400 m
75KASKTAŞİzmit Bay Suspension Bridge - North Side Span Pier Soil Improvement WorksExcavation Support SystemSoil ImprovementEurasiaTurkeyKocaeli01.11.201301.01.2014STFA ConstructionJet Grout: 7.560 m
74KASKTAŞİzmit Bay Suspension Bridge - South Approach ViaductsExcavation Support SystemSpecial ApplicationEurasiaTurkeyYalova01.06.201301.11.2013Nurol ConstructionDiaphragm Wall: 4.215 m2
73KASKTAŞMetropol Ataşehir ProjectPiling WorksDeep FoundationEurasiaTurkeyIstanbul01.06.201301.10.2013Varyap GAPBaretta Pile: 2.650 m
72KASKTAŞPort Moresby US Embassy ProjectPiling WorksDeep FoundationAustraliaPapua New GuineaPort Moresby01.12.201201.06.2013ENKA İnşaat ve Sanayi A.Ş.Precast Concrete Pile: 4.230 m
71KASKTAŞUS Embassy CompaundExcavation Support SystemDeep Foundation, Deep ExcavationAsiaAfghanistanKabul01.03.201201.05.2013ENKA-CaddellSecant Pile: 7.350 m, Foundation Pile: 10.660 m, Anchor: 2.340 m
70KASKTAŞKuntsevo Multifunctional Trade & Business CenterExcavation Support SystemDeep Excavation, Special ApplicationEurasiaRussian FederationMoscow01.07.201101.05.2013ENKA İnşaat ve Sanayi A.Ş.Diaphragm Wall: 26.700 m2, SBMA Anchor: 78.000 m
69KASKTAŞPlot 16 B - Office and Hotel ComplexAnchorage WorksDeep ExcavationEurasiaRussian FederationMoscow01.02.201201.04.2013Capital GroupAnchor: 15.000 m
68KASKTAŞJeddah Storm Water Drainage ProjectExcavation Support SystemSoil Improvement, Deep FoundationAsiaSaudi ArabiaJeddah01.05.201201.01.2013Nesma / Partners CorpSecant Pile: 12.000 m2, Grout Blanket: 12.330 m
67KASKTAŞJeddah Storm Water Drainage ProjectExcavation Support SystemSoil Improvement, Deep FoundationAsiaSaudi ArabiaJeddah01.05.201301.09.2013AL AngariSecant Pile: 3.820 m,
66KASKTAŞJeddah Storm Water Drainage ProjectExcavation Support SystemSoil Improvement, Deep FoundationAsiaSaudi ArabiaJeddah01.11.201301.11.2014China Construction CoSecant Pile: 4.100 m2, Grout Blanket: 7.000 m
65KASKTAŞİzmit Bay Suspension Bridge - Dry Dock Sheet Piling WorksExcavation Support SystemDeep ExcavationEurasiaTurkeyYalova01.08.201201.12.2012STFA ConstructionSheet Pile: 12.420 m, Pre-Jetting: 16.100 m
64KASKTAŞFord Otosan Automobile PlantPiling WorksDeep Foundation, Soil ImprovementEurasiaTurkeyKocaeli01.08.199801.12.2012Ford OtosanBored Pile: 130.000 m, Jet Grout: 670.000 m, Stone Pile: 50.000
63KASKTAŞLevent Özdilek Shopping MallExcavation Support SystemDeep ExcavationEurasiaTurkeyIstanbul01.09.201001.11.2012ÖzdilekBored Pile: 6.800 m, Caisson Wall: 16.000 m2, Soil Nail: 11.500 m, Anchor: 21.500 m, Steel Pipe Bracing: 330 ton
62KASKTAŞMetro Bank ProjectExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.06.201101.09.2012Alto EssetsDiaphragm Wall: 17.500 m2, Bored Pile: 2.500 m
61KASKTAŞKashagan Oil Field Development, Caspian SeaSheet Pile DrivingMarine WorksAsiaKazakhstanBautino01.04.200501.08.2012ENKA-Bechtel JV91.500 ton including; Sheet Pile: 390.000 m2, Steel Pipe Pile: 818 nos, Tie Rod, Waling Beam and H-Beam Installation
60KASKTAŞTüpraş İzmit Refinery (RUP)Piling WorksDeep Foundation, Soil ImprovementEurasiaTurkeyKocaeli01.01.201201.07.2012Tekfen ConstructionFoundation Pile: 8.000 m, Jet Grout: 30.000 m, Barette Pile: 3.800 m
59KASKTAŞTüpraş İzmit Refinery UpgradingPiling WorksSoil ImprovementEurasiaTurkeyKocaeli01.09.201101.06.2012Ark Construction, Tekfen Construction, Gemont, Çimtaş, Artaş ConstructionJet Grout: 132.000 m
58KASKTAŞYakimanskayaPiling WorksDeep FoundationEurasiaRussian FederationYakimanskaya01.03.201101.05.2012Stroyproekt Ltd.Steel Pipe Pile: 1.070 m, Secant Pile: 4.800 m, Steel Pipe Bracing: 139 ton
57KASKTAŞPlot 16 A - Office and Hotel ComplexExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.11.201001.01.2012Ant YapıDiaphragm Wall: 1.700 m2, Anchor: 5.300 m, Bored Pile: 5.250 m
56KASKTAŞMulti-Purpose Public Buildings in SmolenskayaExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.05.201101.12.2011ZAO ProkonsDiaphragm Wall: 6.200 m, Bored Pile: 1.200 m
55KASKTAŞLamar TowersExcavation Support SystemDeep Foundation, Deep Excavation, Special ApplicationAsiaSaudi ArabiaJeddah01.09.200701.10.2011Cayan GroupDiaphragm Wall: 13.500 m2, Anchor: 7.000 m, Bored Pile: 63.800 m, Injectiion: 74.000 m, Slurry Wall: 6.600 m2, Grout Blanket: 350.000 m, Excavation: 220.000 m3
54KASKTAŞLevent Zorlu ProjectExcavation Support SystemDeep ExcavationEurasiaTurkeyIstanbul01.10.201001.06.2011Zorlu Gayrimenkul Geliştirme ve Yatırım A.Ş.Mini Pile: 3.600 m, Anchor: 33.700 m, Excavation: 24.000 m3, Bored Pile: 4.500 m
53KASKTAŞBorusan Gemlik ERW Pipe Plant Soil Improvement WorksSoil Improvement WorksDeep Foundation, Soil ImprovementEurasiaTurkeyBursa01.11.201001.04.2011Borusan MannesmannBored Pile: 25.500 m, Jet Grout: 13.150 m
52KASKTAŞBorusan Gemlik Port Facilities Renovation and Consolidation ProjectSoil Improvement WorksSoil Improvement, Marine WorksEurasiaTurkeyBursa01.06.201001.10.2010Borusan MannesmannJet Grout: 33.400 m
51KASKTAŞWhite Garden ProjectPiling WorksSpecial ApplicationEurasiaRussian FederationMoscow01.04.201001.09.2010Ant YapıTop Down: 272 nos
50KASKTAŞVyborg Compressor StationPiling WorksDeep FoundationEurasiaRussian FederationVyborg01.04.201001.09.2010AsnovaBored Pile: 6.200 m
49KASKTAŞAl Jawhara Tower ProjectPiling WorksDeep Foundation, Soil Improvement, Special ApplicationAsiaSaudi ArabiaJeddah01.06.200901.09.2010Damac PropertiesBored Pile: 11.400 m, Jet Grout: 18.500 m, Grout Blanket: 5.500 m
48KASKTAŞAl Mashaaer Al Mugaddesah MetroAnchorage WorksSlope StabilityAsiaSaudi ArabiaMakkah01.05.201001.08.2010Alfaf Co.Rock Bolt: 65.800 m, Rock Anchor: 17.000 m
47KASKTAŞJabal KhandamahAnchorage WorksSlope StabilityAsiaSaudi ArabiaJeddah01.08.200701.08.2010Al Saedi & MutairyPermanent Anchor: 54.400 m
46KASKTAŞTula Cement FactoryPiling WorksDeep FoundationEurasiaRussian FederationTula01.04.200901.05.2010BetatekBored Pile: 37.000 m
45KASKTAŞAlgeria Motorway ProjectPiling WorksDeep FoundationAfricaAlgeriaAlgeria01.12.200801.09.2009CojaalBored Pile: 9.000 m
44KASKTAŞAlbanian Motorway ProjectAnchorage WorksSlope StabilityEuropeAlbaniaAlbania01.02.200901.08.2009ENKA-Bechtel JVAnchor: 2.000 m, Mini Pile: 2.800 m
43KASKTAŞUS Embassy - DjiboutiPiling WorksDeep FoundationAfricaDjiboutiDjibouti01.03.200901.08.2009ENKA-CaddellBored Piles: 218 nos
42KASKTAŞPaveletskaya Underground ComplexExcavation Support SystemDeep Foundation, Deep Excavation, Soil ImprovementEurasiaRussian FederationMoscow01.06.200801.04.2009ENKA İnşaat ve Sanayi A.Ş.Diaphragm Wall: 7.700 m2, Jet Grout: 8.500 m, Bored Pile: 5.300 m
41KASKTAŞ400 MW Shatura Combined Cycle Power PlantPiling WorksDeep FoundationEurasiaRussian FederationShatura01.06.200801.02.2009Gama Power System Engineering and Contracting Inc.Bored Pile: 14.300 m
40KASKTAŞTuzla Sedef ShipyardSoil Improvement and Piling WorksDeep Foundation, Soil ImprovementEurasiaTurkeyIstanbul01.04.200501.12.2008Sedef Gemi İnşaatJet Grout Column: 168.000 m, Bored Pile: 35.000 m
39KASKTAŞDerna Desalination Plant ProjectPiling WorksDeep FoundationAfricaLibyaDerna01.07.200701.10.2008Acesco, ENKA Teknik General ContractingMini Pile: 14.100 m
38KASKTAŞPlot 11 Transport TerminalPiling WorksDeep FoundationEurasiaRussian FederationMoscow01.12.200601.03.2008Citer InvestBored Pile: 6.400 m
37KASKTAŞOn-Shore Processing Facility, Sakhalin IslandExcavation Support SystemDeep Foundation, Deep ExcavationEurasiaRussian FederationSakhalin01.09.200301.03.2008ENKA-Bechtel-TechnostroyBored Pile: 100.000 m, Sheet Pile: 2.000 m2
36KASKTAŞTsvetnoy Multifunctional ComplexPiling WorksDeep Foundation, Special ApplicationEurasiaRussian FederationMoscow01.06.200701.10.2007ENKA Capital GroupSteel Pipe Pile: 550 m, Secant Pile: 1.140 m, Top Down: 2.400 m
35KASKTAŞPlot 2 Car Par ExtensionShoring and Excavation WorksDeep ExcavatinAsiaSaudi ArabiaMedina01.10.200601.08.2007Saudi Bin Ladin GroupDiaphragm Wall: 8.000 m2, Anchor: 19.500 m, Berliner Wall: 3.900 m
34KASKTAŞChiller PlantAnchorage WorksSlope StabilityAsiaSaudi ArabiaMakkah01.05.200501.08.2007M. Bin LadinPermanent Anchor: 68.300 m
33KASKTAŞJeddah King Abdul Aziz International AirportPiling WorksDeep FoundationAsiaSaudi ArabiaJeddah01.03.200701.07.2007Saudi Bin Ladin GroupBored Pile: 3.467 m
32KASKTAŞShakhtar Donetsk StadiumPiling WorksDeep Foundation, Deep ExcavationEuropeUkraineDonetsk01.08.200601.04.2007ENKA İnşaat ve Sanayi A.Ş.R.C. Driven Pile: 19.600 m, Bored Piles with various lengths and dimensions; Permanent Ground Anchoring Works
31KASKTAŞMirax PlazaPiling WorksDeep FoundationEurasiaRussian FederationMoscow01.12.200601.04.2007Mirax MonolitFoundation Pile: 11.000 m
30KASKTAŞWhite Square Office Center ProjectPiling WorksDeep FoundationEurasiaRussian FederationMoscow01.12.200601.03.2007ENKA İnşaat ve Sanayi A.Ş.Bored Pile: 4.700 m
29KASKTAŞPlot 4 Imperia TowerPiling WorksDeep FoundationEurasiaRussian FederationMoscow01.08.200601.02.2007ENKA İnşaat ve Sanayi A.Ş.Bored Pile: 8.500 m
28KASKTAŞEsentai Park – Tower BuildingExcavation Support SystemDeep Excavation, Soil ImprovementAsiaKazakhstanAlmaty01.02.200601.09.2006ENKA İnşaat ve Sanayi A.Ş.Jet Grout: 14.000 m, Pre-Stressed Anchor: 3.050 m, Rock Bolt: 9.100 m, Shotcrete:600 m2
27KASKTAŞAramco Rabigh Development ProjectPiling WorksDeep Foundation, Soil ImprovementAsiaSaudi ArabiaRabigh01.06.200601.09.2006Consolidated Contractors CompanyBored Pile: 22.000 m, Stone Column: 51.000 m
26KASKTAŞFour Seasons Bosphorus HotelExcavation Support SystemDeep Excavation, Soil ImprovementEurasiaTurkeyIstanbul01.08.200501.08.2006Atik Pasha Turizm A.ŞJet Grout Column: 32.000 m, Anchor: 17.000 m, Bored Pile: 3.200 m,Mini Pile: 5.900 m
25KASKTAŞOued Athmenia DamInvestigation Drilling, Anchorage and Piling WorksSlope Stability, Soil ImprovementAfricaAlgeriaConstantine01.11.200201.03.2006ENKA-Kougc-Gecet-NastonMini Pile: 2.700 m, Anchor: 5.300 m, Injection: 30.630 m, Soil Nail: 1.400 m, Investigation Drilling: 1.200 m, Drainage Drilling: 4.500 m
24KASKTAŞPlot 9 Moscow and St. Petersburg TowersExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.05.200401.12.2005Ant YapıSoil Anchor: 5.500 m, Bored Pile: 9.500 m, Steel Pipe Pile: 3.500 m
23KASKTAŞFenerbahçe Şükrü Saraçoğlu StadiumPiling WorksDeep FoundationEurasiaTurkeyIstanbul01.08.199901.11.2005Fenerbahçe Sports ClubBored Pile: 55.000 m
22KASKTAŞPlot 12 Multi-Purpose Office and Residence - TechinvestExcavation Support SystemDeep Foundation, Deep ExcavationEurasiaRussian FederationMoscow01.07.200401.11.2005ENKA İnşaat ve Sanayi A.Ş.Diaphragm Wall: 11.500 m2, Soil Anchor: 10.000 m, Excavation: 230.000 m3, Steel Pipe Pile: 2.300 m
21KASKTAŞJabal Al KabaAnchorage WorksSlope StabilityAsiaSaudi ArabiaMakkah01.05.200401.05.2005Abdul Latif Jameel Real Estate (ALJ)Anchor Works: 10.000 m, Rock Bolt: 2.000 m
20KASKTAŞTengiz & Munay Daria ProjectsPiling WorksDeep Foundation, Deep ExcavationAsiaKazakhstanTengiz01.03.200401.04.2005Munay DariaR.C.Driven Pile: 17.000 m, Sheet Pile: 27.500 m2, 94 no. Tie Rods Installation
19KASKTAŞPlot 1 Bani NajjarAnchorage WorksDeep ExcavationAsiaSaudi ArabiaMedina01.04.200401.03.2005Aqar HoldingExcavation: 250.000 m3, Shoring Works: 21.000 m2
18KASKTAŞPlot 13 Federation TowersExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.04.200401.01.2005Mirax CityBored Pile: 6.000 m, Anchor: 7.300 m
17KASKTAŞPlot 10 Naberezhnaya TowersExcavation Support SystemDeep ExcavationEurasiaRussian FederationMoscow01.08.200401.12.2004ENKA İnşaat ve Sanayi A.Ş.Steel Pipe Pile: 8.500 m, Anchor: 4.000 m
16KASKTAŞPlot 5 Qebla CenterShoring WorksDeep Foundation, Deep ExcavationAsiaSaudi ArabiaMedina01.11.200301.06.2004Aqar HoldingBored Pile: 18.000 m, Berliner Wall: 8.000 m2; Slurry Wall: 2.600 m
15KASKTAŞC&WP Topside ProjectPiling WorksDeep Foundation, Soil ImprovementAsiaAzerbaijanBaku01.02.200301.01.2004Tekfen ConstructionStone Column: 122.000 m, Vertical and raked Steel Pipe Piles: 10.000 m
14KASKTAŞArtvin Deriner DamSlope StabilitySlope StabilityEurasiaTurkeyArtvin01.09.200101.06.2003Erg ConstructionPre-Stressed Rock Anchor: 14.000 m
13KASKTAŞPoti Port Petroleum Products Storage and Handling Terminal ProjectSoil Improvement WorksSoil ImprovementAsiaGeorgiaPoti01.12.200101.12.2002ÜSTAY Construction-Contracting and Trading CompanyStone Column: 11.000 m
12KASKTAŞRehabilitaion of Mostar BridgeDrilling WorksSoil ImprovementEuropeBosnia and HerzegovinaMostar01.05.200101.02.2002Yapı MerkeziDrilling and Grouting under Water: 14.000 m
11KASKTAŞJeddah Hilton HotelExcavation Support SystemDeep Excavation, Special ApplicationAsiaSaudi ArabiaJeddah01.10.199501.09.2001Half Trading and Contracting Est.Base and Skin Grouted Piles: 36.000 m
10KASKTAŞIstanbul US Embassy ProjectExcavation Support SystemSlope StabilityEurasiaTurkeyIstanbul01.01.200101.07.2001ENKA İnşaat ve Sanayi A.Ş.Soil Nail: 1.700 m2
9KASKTAŞAliağa Cycle Power PlantsSoil Improvement WorksSoil ImprovementEurasiaTurkeyİzmir01.06.200001.01.2001ENKA-Bechtel JVJet Grout: 78.000 m
8KASKTAŞAktau Port Rehabilitation ProjectPiling WorksDeep Foundation, Marine WorksAsiaKazakhstanAktau01.09.199701.09.1999ENKA-Bechtel JV592 nos Vertical and Raked Steel Pipe Piles; 106 nos Raked Piles; 8,400 m2 Sheet Pile
7KASKTAŞTaiba 1-2-3 (Hotel and Business Center)Excavation Support SystemDeep Excavation, Deep FoundationAsiaSaudi ArabiaMedina01.05.199201.05.1996Saudi Constractoners Est.Bored Pile
6KASKTAŞPlot 3 Medina Taiba HotelsShoring and Excavation WorksDeep Excavation, Deep FoundationAsiaSaudi ArabiaMedina01.11.199401.04.1995Al RawafidShoring and Excavation Works
5KASKTAŞPlot 4 Medina Hilton HotelPiling WorksDeep FoundationAsiaSaudi ArabiaMedina01.11.199401.02.1995Half Trading and Contracting Est.Bored Pile: 4.200 m
4KASKTAŞPlot 9 Dallah 1&2Piling WorksDeep Excavation, Deep FoundationAsiaSaudi ArabiaMedina01.01.199401.09.1994Dallah Group CompanyBored Pile: 4.000 m, Berliner Wall: 1.800 m2
3KASKTAŞPlot 6 Sedco Tower Commercial and Residential CenterPiling WorksDeep FoundationAsiaSaudi ArabiaMedina01.10.199301.08.1994Sedco (Bin Mahfouz)Piling Works: 4.800 m
2KASKTAŞPlot 7 Prophet’s Mosque Extension ProjectPiling WorksDeep FoundationAsiaSaudi ArabiaMedina01.10.198601.04.1987Min. of Finance & National Economy and M. Bin Ladin GroupBored Pile: 4.500 m
1KASKTAŞPlot 8 Justice CourtPiling WorksDeep FoundationAsiaSaudi ArabiaMedina01.12.198601.04.1987Min. of Ewkaf and M. Bin Ladin GroupBored Pile: 10.750 m