Albanian Motorway Project was undertaken by Enka and Bechtel in September, 2006. The Rreshen-Kalimash Motorway Project is a key connection between Durres Port, Albania’s primary harbor on the Adriatic Sea, and Kosovo. The Rreshen-Kalimash motorway’s main purpose is to serve as a faster and safer route through the mountainous region. Within the scope of the project, permanent anchors, mini piles and drainage drillings were completed by KASKTAŞ.

Project Description

Albanian Motorway Project

  • Engineering

Project Features

Client
ENKA Bechtel JV
Key Quantities
Permanent Anchor 1,965 m
Mini Pile 2,800 m
Drainage Drilling
Project Duration
Start Date 01.02.2009
Finish Date 01.08.2009
Duration 6 Months

Location

Albania

 

 

Gallery

Related Projects

شروع مسار المحطة – 6 لأعمال الخوازيق

شروع مسار...

Asia Completed Projects...
مشروع مسار

مشروع مسار

Asia Completed Projects...
أعمال تدعيم برج إن سي إم إس

أعمال تدعيم...

Asia Completed Projects...
أعمال تثبيت المنحدر في جبل الكعبة – المرحلة 3

أعمال تثبيت...

Asia Completed Projects...