Sadoviy Kvartal Deep Excavation Support Project

Sadoviy Kvartal Deep Excavation Support Project

As of March 2019, diaphragm wall works within the scope of Stage 3 and 5 construction works of Sadoviy Kvartal Multifunctional Residence with Underground Car Park Project located in Hamovniki Region, which is one of the most prestigious district of
أعرف أكثر
Domodedovo Airport Project

Domodedovo Airport Project

أعرف أكثر
Iraq Dhi Qar and Samawa Combined Cycle Power Plant Project

Iraq Dhi Qar and Samawa Combined Cycle Power Plant Project

أعرف أكثر
Çanakkale 1915 Bridge Project / European Anchor Block Excavation

Çanakkale 1915 Bridge Project / European Anchor Block Excavation

أعرف أكثر
King Abdulaziz Roadway Project

King Abdulaziz Roadway Project

أعرف أكثر
Mandarin Oriental Bosphorus Hotel Project

Mandarin Oriental Bosphorus Hotel Project

أعرف أكثر
Ferko Line Office and Hotel Project

Ferko Line Office and Hotel Project

The shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding
أعرف أكثر
Riyadh Metro Project Piling and Shoring Works

Riyadh Metro Project Piling and Shoring Works

Within the content of the Riyad Metro Project, one of the largest construction projects in Saudi Arabia, bored piles with 120 cm and 150 cm diameter in the Western Stretch region viaducts were completed. The project is followed by piling
أعرف أكثر
İzmir Aliağa Star Refinery Projects

İzmir Aliağa Star Refinery Projects

Within the scope of İzmir Aliağa Refinery Project; which is the largest private sector investment project in Turkey, several sub-contract works have been carried out under different main contractors. Under these subcontracts; Terrace 5&6 Permanent SBMA Anchor Works, Terrace 7
أعرف أكثر
NEF Projects

NEF Projects

NEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed.  Within the content of NEF 11 Project 5,500 m
أعرف أكثر