Michurinsky Bored Pile Project

Michurinsky Bored Pile Project

Within the scope of the Michurinsky residency project in Moscow, 17,400 m of Bored Pile work has been completed. The completed piles have the following properties: After the concrete has been poured into each pile, a precast concrete pile is
أعرف أكثر
Bahçeşehir University Education Building Project

Bahçeşehir University Education Building Project

أعرف أكثر
Ferko Line Office and Hotel Project

Ferko Line Office and Hotel Project

The shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding
أعرف أكثر
Mahall Bomonti İzmir Project

Mahall Bomonti İzmir Project

The Mahall Bomonti İzmir Project under construction is located at Bayraklı region in  İzmir. The deep foundation system and shoring design of Mahall Bomonti İzmir Project; which has a maximum 20 m of excavation depth and partially under ground water
أعرف أكثر
Alarko Kabataş Construction Site, Shoring Works of NATM, TBM and Turnout Shaft

Alarko Kabataş Construction Site, Shoring Works of NATM, TBM and Turnout Shaft

Within the scope of Kabataş-Mecidiyeköy-Mahmutbey Subway Project, shoring works of NATM, TBM and Turnout shaft in Kabataş, Istanbul has been carried out. The excavation depth of these three shafts vary between 43.10 m to 45.4 m and they are very
أعرف أكثر
İzmir Aliağa Star Refinery Projects

İzmir Aliağa Star Refinery Projects

Within the scope of İzmir Aliağa Refinery Project; which is the largest private sector investment project in Turkey, several sub-contract works have been carried out under different main contractors. Under these subcontracts; Terrace 5&6 Permanent SBMA Anchor Works, Terrace 7
أعرف أكثر
Eurasia Tunnel – Istanbul Strait Road Tube Crossing Project

Eurasia Tunnel – Istanbul Strait Road Tube Crossing Project

Within the scope of Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures called as transition boxes and prepared
أعرف أكثر
Moscow International Business Center

Moscow International Business Center

Moscow City, or the Moscow International Business Center by its full name, is situated four kilometers west of the Kremlin on Krasnopresnenskaya (an embankment of the Moscow River), and is one of the largest and most ambitious construction projects. The
أعرف أكثر
Eroğlu Skyland Project

Eroğlu Skyland Project

Skyland Project consists of 3 number of tower (Offices, Residences and Hotel) and a shopping with wellness center. This is the deepest excavation project with its 76 m depth supported with anchors not only in Europe but also in the
أعرف أكثر
NEF Projects

NEF Projects

NEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed.  Within the content of NEF 11 Project 5,500 m