Shoring and piling works were completed as the end of July 2022 in the Barrikadnaya Kinoteatr Project, which is being built as a hotel and cultural center in the city of Moscow. The shoring structure of the project consists of secant piled wall supported by anchors. In the project, following the completion of the secant piles, anchors were manufactured simultaneously with the excavation works. With the completion of the 23 m deep excavation pit, bored piles were executed at the foundation level and all the works within the project were completed.