• News
  • About Us
    • History
    • Publication List
    • Design & Engineering
  • Vision & Values
  • Health, Safety & Environment
  • Our Activities
    • Deep Foundations
    • Deep Excavations
    • Slope Stability
    • Soil Improvement
    • Marine Works
    • Special Applications
  • Quality Management
  • Machinery & Equipment
  • Projects
  • Quick Links
    • Contact Us
    • Career
    • Privacy Policy
    • Terms of Use
    • ENKA BIST Stock Exchange
  • TURKISH
  • RUSSIAN
  • ARABIC

Site Search
KASKTAŞ
  • MENU
  • News
  • About Us
    • History
    • Publication List
    • Design & Engineering
  • Vision & Values
  • Health, Safety & Environment
  • Our Activities
    • Deep Foundations
    • Deep Excavations
    • Slope Stability
    • Soil Improvement
    • Marine Works
    • Special Applications
  • Quality Management
  • Machinery & Equipment
  • Projects
  • Quick Links
    • Contact Us
    • Career
    • Privacy Policy
    • Terms of Use
    • ENKA BIST Stock Exchange
  • TURKISH
  • RUSSIAN
  • ARABIC

Masar Project Package-A Shoring Works

Home| General| Masar Project Package-A Shoring Works

10
Jun, 2021
By Engin Kurtkaya
Masar Project Package-A Shoring Works
  • General

The Masar Project, which is under construction in Makkah City of Saudi Arabia, is a mega project that aims to enable visitors coming through the Haramain Train, connecting Medina-Jeddah-Makkah, to reach the Harem via the subway system. The contract was signed with Project Representative Umm Al Qura for Development & Construction on December 20, 2020 for the shoring works of 6 out of 350 plots (Package-A). Under the Package-A contract, there are 2.600 m of Bored Pile, 4.600 m² of Berliner Wall, 8.200 m of Anchor, 3.400 m of Tie-Back Anchor, 3.000 m of Soil Nail and 1.000 m² of Shotcrete works.

 

The design works, which were carried out by Kasktaş, were completed on December 25, 2021. Execution in two different parcels were started as of February 2021. By the end of May 2021, 1.100 m of Bored Pile, 350 m2 of Berliner Wall and 500 m of Anchor works were completed. All works within the scope of the project are planned to be completed by the end of 2021.

About Engin Kurtkaya

About Us

  • News
  • History
  • Design & Engineering
  • Publication List
  • Representative Offices

Vision & Values

  • Vision & Values

HSE, Quality & Machinery

  • Health, Safety & Environment
  • Quality Management
  • Machinery & Equipment

Our Activities

  • Deep Foundations
  • Deep Excavations
  • Marine Works
  • Slope Stability
  • Soil Improvement
  • Special Applications

Quick Links

  • Contact Us
  • Career
  • Representative Offices
  • Privacy Policy
  • Terms of Use
  • ENKA BIST Stock Exchange

Recent Posts

  • JEDDAH ISLAMIC PORT SHORING WORKS
  • JK Era Residential Complex
  • JK Ever Multifunctional Residence Project
  • Ostrov-6 Project Diaphragm Wall Works Were Completed
  • Masar Project Package A & B Shoring Works were Completed
  • MBE Metro Project TOKİ Station Shoring Works
  • 18th National Conference on Soil Mechanics and Geotechnical Engineering

Contact Us

 
  • Balmumcu Mah., E. İsmail Hakkı Sok.
    No: 1, 34349,
    Beşiktaş Istanbul, Turkey
  • Phone: +90 (212) 274 58 42
    Fax: +90 (212) 266 33 93
  • kasktas@kasktas.com.tr
  • recruitment@kasktas.com.tr
    (Application for Employment & Internship)

Follow Us

KASKTAŞ is a subsidiary of ENKA.