The contract covering the shoring works was signed with Mafheem Al-E’mar for the safe excavation of the tower construction to be made within the scope of the National Company Building for Mechanical System Project in Riyadh. The project consists of 8,000 m of Secant Pile and 5,600 m of Anchor works.
50% of the pile work within the scope of the project has been completed as the end of January 2021. All works within the scope of the project are planned to be completed by May 2021.