The contract was signed on August 12, 2020, for the executions of Sheet Pile, Pipe Driving and Soil Improvement by Vibrocompaction with Enka Cons. and Devel. B. V. Bahamas Branch, who undertook the marine construction within the scope of the Nassau Cruise Port Improvement and Expansion Project to be built in the Bahamas. The project consists of a combi wall composed of steel tubular piles and sheet pile; and tie-rods.
The construction was started on December 10, 2020 and as the end of January 2021, the front combi wall has been completed. All works within the scope of the project are ongoing as per the work schedule.