Located at the intersection of the Clasiyo and Akademiceskya Streets in Moscow, Saharova RED 7 Project consists of luxurious residences, 4 underground car park floors and trade centers. Within the scope of the project, all the existing reinforced concrete constructions at the site, except diaphragm walls, will be removed and bored piles will be installed under the building. After the slab located at 0.00 level was taken out, a steel platform; which has a capacity of 200-tons, was formed on top of the slab located at -1.00 level and the bored pile machine was placed on this platform. During bored pile installations, the steel platform with a hydraulic system enables to move piling machine to all pile locations.
A total of 5.600 m of 88-100 cm diameter bored pile installation works has started as of March 6, 2019.