{"id":10970,"date":"2021-09-24T10:38:06","date_gmt":"2021-09-24T07:38:06","guid":{"rendered":"https:\/\/www.kasktas.com.tr\/?p=10970"},"modified":"2021-09-24T10:38:06","modified_gmt":"2021-09-24T07:38:06","slug":"css-metro-project-s21b-structure-diaphragm-wall-works","status":"publish","type":"post","link":"https:\/\/www.kasktas.com.tr\/en\/css-metro-project-s21b-structure-diaphragm-wall-works\/","title":{"rendered":"CSS Metro Project S21B Structure Diaphragm Wall Works"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>The construction works at the \u00c7ekmek\u00f6y \u2013 Sancaktepe \u2013 Sultanbeyli Metro Line, which will be built as an extension of the \u00dcsk\u00fcdar \u2013 \u00dcmraniye \u2013 \u00c7ekmek\u00f6y Metro Project, gained momentum in 2021. The contract for the S21B Structure Diaphragm Wall Works within the scope of the CCS Metro Project was signed with Do\u011fu\u015f \u2013 Yap\u0131 Merkezi \u2013 \u00d6zalt\u0131n Joint Venture. The contract covers 10.400 m<sup>2<\/sup> of Diaphragm Wall. The diaphragm wall works within the project are executed with the Bauer MC96-BC48 HDS-T, which is the latest addition to our machinery fleet. The project was started in the mid-September and will be completed by December 2021.[vc_row][vc_column][vc_gallery interval=&#8221;3&#8243; images=&#8221;10963&#8243; img_size=&#8221;full&#8221;][\/vc_column][\/vc_row]\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The construction works at the \u00c7ekmek\u00f6y \u2013 Sancaktepe \u2013 Sultanbeyli Metro Line, which will be built as an extension of the \u00dcsk\u00fcdar \u2013 \u00dcmraniye \u2013 \u00c7ekmek\u00f6y Metro Project, gained momentum in 2021. The contract for the S21B Structure Diaphragm Wall Works within the scope of the CCS Metro Project was signed with Do\u011fu\u015f \u2013 Yap\u0131 <a class=\"more-link\" href=\"https:\/\/www.kasktas.com.tr\/en\/css-metro-project-s21b-structure-diaphragm-wall-works\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":16,"featured_media":10967,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[237],"tags":[903,1065,1066,1068,892,893,885,1061,1059,1044,1051,1063,1046,913,1069,896,916,912,897,886,887,1060,895,880,911,884,1053,891,1047,881,883,910,902,1045,1043,894,1050,1049,919,905,923,1058,899,1052,1064,909,1056,1057,906,920,904,924,898,1055,1048,890,918,915,922,907,1054,901,1067,889,888,1062,917,908,914,921,457,459,460,461,462,471,539,540,541],"class_list":["post-10970","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general","tag-anchor-en","tag-anchoragewall-en","tag-ankrajduvar-en","tag-baglanticubugu-en","tag-berlinduvari-en","tag-berlinerwall-en","tag-boredpile-en","tag-borukazik-en","tag-cakmakazik-en","tag-civilengineering-en","tag-column-en","tag-combiwall-en","tag-construction-en","tag-deepexcavation-en","tag-deepfoundation-en","tag-deepsoilmixing-en","tag-denizisleri-en","tag-derinkazi-en","tag-derinzeminkaristirma-en","tag-diaphragmwall-en","tag-diyaframduvar-en","tag-drivenpile-en","tag-dsm-en","tag-enka-en","tag-excavation-en","tag-forekazik-en","tag-foundationpile-en","tag-gecirimsizduvar-en","tag-geotechnicalengineering-en","tag-geotechnics-en","tag-geoteknikmuhendisligi-en","tag-hafriyat-en","tag-iksakazigi-en","tag-insaat-en","tag-insaatmuhendisligi-en","tag-jetgrout-en","tag-jetgroutcolumn-en","tag-jetgroutkolonu-en","tag-kaya-en","tag-kayabulonu-en","tag-kayamekanigi-en","tag-kazik-en","tag-kesisenkazik-en","tag-kolon-en","tag-kombiduvar-en","tag-palplans-en","tag-pile-en","tag-piling-en","tag-puskurtmebeton-en","tag-rock-en","tag-rockbolt-en","tag-rockmechanics-en","tag-secantpile-en","tag-shoringpile-en","tag-slurryduvar-en","tag-slurrywall-en","tag-soil-en","tag-soilimprovement-en","tag-soilmechanics-en","tag-soilnail-en","tag-temelaltikazik-en","tag-temelkazigi-en","tag-tierod-en","tag-topdownkazik-en","tag-topdownpile-en","tag-tubularpile-en","tag-zemin-en","tag-zemincivisi-en","tag-zeminiyilestirme-en","tag-zeminmekanigi-en","tag-ankraj-en","tag-derintemeller-en","tag-geoteknik-en","tag-kasktas-en","tag-kazi-en","tag-marineworks","tag-sbma-en","tag-sheetpile-en","tag-shotcrete-en"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts\/10970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/comments?post=10970"}],"version-history":[{"count":0,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts\/10970\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/media\/10967"}],"wp:attachment":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/media?parent=10970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/categories?post=10970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/tags?post=10970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}