{"id":12448,"date":"2026-06-05T14:01:45","date_gmt":"2026-06-05T11:01:45","guid":{"rendered":"https:\/\/www.kasktas.com.tr\/?p=12448"},"modified":"2026-06-05T14:01:45","modified_gmt":"2026-06-05T11:01:45","slug":"work-continues-at-full-speed-in-iyidere-the-strategic-logistics-hub-of-the-black-sea","status":"publish","type":"post","link":"https:\/\/www.kasktas.com.tr\/en\/work-continues-at-full-speed-in-iyidere-the-strategic-logistics-hub-of-the-black-sea\/","title":{"rendered":"Work Continues at Full Speed in \u0130yidere, the Strategic Logistics Hub of the Black Sea"},"content":{"rendered":"<div class=\"wpb-content-wrapper\">[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]The Rize \u0130yidere Logistics Port Project, one of the most strategic infrastructure investments on T\u00fcrkiye\u2019s Black Sea coast, is set to become a key logistics hub that will strengthen not only regional but also national logistics capacity upon completion.<\/p>\n<p>The project will play a critical role in enhancing the trade potential of the Eastern Black Sea region by accelerating export processes, optimizing logistics costs, and improving integration with international trade networks. In addition, it is expected to contribute significantly to regional development through the employment opportunities it will create and its positive impact on the industrial and commercial ecosystem.<\/p>\n<p>As KASKTA\u015e, our diaphragm wall and ground improvement works are progressing steadily in line with the project objectives and planned schedule.<\/p>\n<p><strong>As of March 2026:<\/strong><\/p>\n<ul>\n<li>35% of the diaphragm wall construction works, with depths ranging from 26 to 37 meters, have been completed.<br \/>\n\u2022 95% of the barrette pile construction works, with lengths ranging from 14 to 37 meters, have been completed.<br \/>\n\u2022 95% of the ground improvement works carried out through jet grouting and DTH drilling have been successfully completed.<\/li>\n<\/ul>\n<p>As of the end of March, the overall project progress has reached 78%, and all works are continuing successfully in accordance with the target schedule.<\/p>\n<p>We are proud to contribute to our country\u2019s strategic infrastructure investments through our engineering expertise, extensive field experience, and quality-driven approach.<\/p>\n<p><strong>Together, we are building the logistics infrastructure of the future.<\/strong>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_gallery interval=&#8221;3&#8243; images=&#8221;12450&#8243; img_size=&#8221;full&#8221; css=&#8221;&#8221;][\/vc_column][\/vc_row]\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]The Rize \u0130yidere Logistics Port Project, one of the most strategic infrastructure investments on T\u00fcrkiye\u2019s Black Sea coast, is set to become a key logistics hub that will strengthen not only regional but also national logistics capacity upon completion. The project will play a critical role in enhancing the trade potential of the Eastern <a class=\"more-link\" href=\"https:\/\/www.kasktas.com.tr\/en\/work-continues-at-full-speed-in-iyidere-the-strategic-logistics-hub-of-the-black-sea\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":16,"featured_media":12449,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[312,237,315],"tags":[1065,1066,1068,1660,1069,1691,1661,1662,1692,1693,1663,1694,1695,1696,1666,1667,1697,1067,457,459,460,461,462,539,540,541],"class_list":["post-12448","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-deep-foundations","category-general","category-soil-improvement","tag-anchoragewall-en","tag-ankrajduvar-en","tag-baglanticubugu-en","tag-bi-directionalloadtest","tag-deepfoundation-en","tag-engineering-marinestructures","tag-engineeringexcellence","tag-foundationengineering","tag-groundimprovement","tag-infrastructure","tag-innovationinengineering","tag-iyiderelojistiklimani","tag-jetgrouting","tag-marinestructures","tag-pileloadtest","tag-realtimemonitoring","tag-rizeiyidere","tag-tierod-en","tag-ankraj-en","tag-derintemeller-en","tag-geoteknik-en","tag-kasktas-en","tag-kazi-en","tag-sbma-en","tag-sheetpile-en","tag-shotcrete-en"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts\/12448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/comments?post=12448"}],"version-history":[{"count":2,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts\/12448\/revisions"}],"predecessor-version":[{"id":12453,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts\/12448\/revisions\/12453"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/media\/12449"}],"wp:attachment":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/media?parent=12448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/categories?post=12448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/tags?post=12448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}