{"id":7612,"date":"2019-03-15T14:40:25","date_gmt":"2019-03-15T11:40:25","guid":{"rendered":"http:\/\/www.kasktas.com.tr\/?p=7612"},"modified":"2019-03-15T15:19:57","modified_gmt":"2019-03-15T12:19:57","slug":"1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works","status":"publish","type":"post","link":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/","title":{"rendered":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS"},"content":{"rendered":"<p>Following the successful completion of European and Asian Anchor Block excavation support works, the contract for the construction of 365 m long European Approach Viaduct ground treatment and piling works has been signed with the consortium DLSY (Yap\u0131 Merkezi-Daelim-SK-Limak)<\/p>\n<p>Within the scope of the ground treatment works of the project, approximately 120,000 m deep mixing column (DSM) and ~29,000 m\u00b3 unreinforced barrette piles shall be executed. In order to ensure the soft soil layers to be secured against liquefaction and deep seated slip; DSM columns to be constructed in \u00a0\u00a0\u00a0\u00a0\u00a0\u00a026.5 m length by means of intersecting cell lines and barrette piles up to 65 m depth constitute the difficult and ambitious applications of the project. In addition to the ground treatment works to be carried out around the foundations of viaducts; a total of 6,200 m foundation piles with a diameter of 150 cm and a maximum depth of 70 m shall be executed. Prior to the design applications of DSM columns, test columns shall be constructed to determine the engineering parameters of DSM columns and improved soil. Additionally, before commencement of the construction of piles with 150 cm diameter, 2 test piles shall be executed in order to verify the design load. These piles will be tested under a total of 26 MN axial load by means of bi-directional loading test. Bauer BG 45 bored pile, RTG 27S DSM and MC 64-BC-32 diaphragm wall machines; which are recently joined to our machinery park and equipped with the latest technology shall be used for the execution of the challenging works; much more deeper than the conventional works.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following the successful completion of European and Asian Anchor Block excavation support works, the contract for the construction of 365 m long European Approach Viaduct ground treatment and piling works has been signed with the consortium DLSY (Yap\u0131 Merkezi-Daelim-SK-Limak) Within the scope of the ground treatment works of the project, approximately 120,000 m deep mixing <a class=\"more-link\" href=\"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":16,"featured_media":7621,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[313,312,316],"tags":[516,520,536],"class_list":["post-7612","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-deep-excavations","category-deep-foundations","category-marine-works","tag-artificial-island-en","tag-combi-wall-en","tag-pile-load-test-ve-geotechnical-monitoring-en"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Following the successful completion of European and Asian Anchor Block excavation support works......\" \/>\n\t<meta name=\"robots\" content=\"max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"Engin Kurtkaya\"\/>\n\t<meta name=\"google-site-verification\" content=\"ImHEFhUwHbSbd4lffZSxK9u-3S4IKD2_1ok0HOmvqPk\" \/>\n\t<meta name=\"keywords\" content=\"artificial island,combi wall,pile load test ve geotechnical monitoring,deep excavations,deep foundations,marine works\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\n\t\t<!-- Google tag (gtag.js) -->\n<script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-GBF8PLK5JP\"><\/script>\n<script>\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-GBF8PLK5JP');\n<\/script>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#article\",\"name\":\"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS | KASKTA\\u015e\",\"headline\":\"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS\",\"author\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/author\\\/engin-kurtkaya\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/ViyadukCanakkale.jpg\",\"width\":1200,\"height\":800},\"datePublished\":\"2019-03-15T14:40:25+03:00\",\"dateModified\":\"2019-03-15T15:19:57+03:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#webpage\"},\"articleSection\":\"Deep Excavations, Deep Foundations, Marine Works, Artificial Island, Combi Wall, Pile Load Test ve Geotechnical Monitoring, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/category\\\/deep-foundations\\\/#listItem\",\"name\":\"Deep Foundations\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/category\\\/deep-foundations\\\/#listItem\",\"position\":2,\"name\":\"Deep Foundations\",\"item\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/category\\\/deep-foundations\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#listItem\",\"name\":\"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#listItem\",\"position\":3,\"name\":\"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/category\\\/deep-foundations\\\/#listItem\",\"name\":\"Deep Foundations\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/#organization\",\"name\":\"KASKTA\\u015e Kayar Kal\\u0131p Altyap\\u0131 Sondaj Kaz\\u0131k ve Tecrit A.\\u015e.\",\"description\":\"Kayar Kal\\u0131p Altyap\\u0131 Sondaj Kaz\\u0131k ve Tecrit A.\\u015e.\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/\",\"telephone\":\"+902122745842\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/wp-content\\\/uploads\\\/2016\\\/03\\\/kasktas-favicon.jpg\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#organizationLogo\",\"width\":425,\"height\":425},\"image\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/KasktasTR?lang=tr\",\"https:\\\/\\\/www.instagram.com\\\/kasktastr\\\/?hl=tr\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCtdqyCnE1uZiCkl3Luedj6Q\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/kasktasas\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/author\\\/engin-kurtkaya\\\/#author\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/author\\\/engin-kurtkaya\\\/\",\"name\":\"Engin Kurtkaya\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#authorImage\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/wp-content\\\/litespeed\\\/avatar\\\/13fbbaef7bb9e3cdaaac200d821006a1.jpg?ver=1784196719\",\"width\":96,\"height\":96,\"caption\":\"Engin Kurtkaya\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#webpage\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/\",\"name\":\"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS | KASKTA\\u015e\",\"description\":\"Following the successful completion of European and Asian Anchor Block excavation support works......\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/author\\\/engin-kurtkaya\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/author\\\/engin-kurtkaya\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/ViyadukCanakkale.jpg\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#mainImage\",\"width\":1200,\"height\":800},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\\\/#mainImage\"},\"datePublished\":\"2019-03-15T14:40:25+03:00\",\"dateModified\":\"2019-03-15T15:19:57+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/\",\"name\":\"KASKTA\\u015e\",\"description\":\"Kayar Kal\\u0131p Altyap\\u0131 Sondaj Kaz\\u0131k ve Tecrit A.\\u015e.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.kasktas.com.tr\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS | KASKTA\u015e","description":"Following the successful completion of European and Asian Anchor Block excavation support works......","canonical_url":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/","robots":"max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"artificial island,combi wall,pile load test ve geotechnical monitoring,deep excavations,deep foundations,marine works","webmasterTools":{"google-site-verification":"ImHEFhUwHbSbd4lffZSxK9u-3S4IKD2_1ok0HOmvqPk","miscellaneous":"&lt;!-- Google tag (gtag.js) --&gt;\n&lt;script async src=\"https:\/\/www.googletagmanager.com\/gtag\/js?id=G-GBF8PLK5JP\"&gt;&lt;\/script&gt;\n&lt;script&gt;\n  window.dataLayer = window.dataLayer || [];\n  function gtag(){dataLayer.push(arguments);}\n  gtag('js', new Date());\n\n  gtag('config', 'G-GBF8PLK5JP');\n&lt;\/script&gt;"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#article","name":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS | KASKTA\u015e","headline":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS","author":{"@id":"https:\/\/www.kasktas.com.tr\/en\/author\/engin-kurtkaya\/#author"},"publisher":{"@id":"https:\/\/www.kasktas.com.tr\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.kasktas.com.tr\/wp-content\/uploads\/2019\/03\/ViyadukCanakkale.jpg","width":1200,"height":800},"datePublished":"2019-03-15T14:40:25+03:00","dateModified":"2019-03-15T15:19:57+03:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#webpage"},"isPartOf":{"@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#webpage"},"articleSection":"Deep Excavations, Deep Foundations, Marine Works, Artificial Island, Combi Wall, Pile Load Test ve Geotechnical Monitoring, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.kasktas.com.tr\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.kasktas.com.tr\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.kasktas.com.tr\/en\/category\/deep-foundations\/#listItem","name":"Deep Foundations"}},{"@type":"ListItem","@id":"https:\/\/www.kasktas.com.tr\/en\/category\/deep-foundations\/#listItem","position":2,"name":"Deep Foundations","item":"https:\/\/www.kasktas.com.tr\/en\/category\/deep-foundations\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#listItem","name":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.kasktas.com.tr\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#listItem","position":3,"name":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS","previousItem":{"@type":"ListItem","@id":"https:\/\/www.kasktas.com.tr\/en\/category\/deep-foundations\/#listItem","name":"Deep Foundations"}}]},{"@type":"Organization","@id":"https:\/\/www.kasktas.com.tr\/en\/#organization","name":"KASKTA\u015e Kayar Kal\u0131p Altyap\u0131 Sondaj Kaz\u0131k ve Tecrit A.\u015e.","description":"Kayar Kal\u0131p Altyap\u0131 Sondaj Kaz\u0131k ve Tecrit A.\u015e.","url":"https:\/\/www.kasktas.com.tr\/en\/","telephone":"+902122745842","logo":{"@type":"ImageObject","url":"https:\/\/www.kasktas.com.tr\/wp-content\/uploads\/2016\/03\/kasktas-favicon.jpg","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#organizationLogo","width":425,"height":425},"image":{"@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/KasktasTR?lang=tr","https:\/\/www.instagram.com\/kasktastr\/?hl=tr","https:\/\/www.youtube.com\/channel\/UCtdqyCnE1uZiCkl3Luedj6Q","https:\/\/www.linkedin.com\/company\/kasktasas\/"]},{"@type":"Person","@id":"https:\/\/www.kasktas.com.tr\/en\/author\/engin-kurtkaya\/#author","url":"https:\/\/www.kasktas.com.tr\/en\/author\/engin-kurtkaya\/","name":"Engin Kurtkaya","image":{"@type":"ImageObject","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#authorImage","url":"https:\/\/www.kasktas.com.tr\/wp-content\/litespeed\/avatar\/13fbbaef7bb9e3cdaaac200d821006a1.jpg?ver=1784196719","width":96,"height":96,"caption":"Engin Kurtkaya"}},{"@type":"WebPage","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#webpage","url":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/","name":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS | KASKTA\u015e","description":"Following the successful completion of European and Asian Anchor Block excavation support works......","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.kasktas.com.tr\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#breadcrumblist"},"author":{"@id":"https:\/\/www.kasktas.com.tr\/en\/author\/engin-kurtkaya\/#author"},"creator":{"@id":"https:\/\/www.kasktas.com.tr\/en\/author\/engin-kurtkaya\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.kasktas.com.tr\/wp-content\/uploads\/2019\/03\/ViyadukCanakkale.jpg","@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#mainImage","width":1200,"height":800},"primaryImageOfPage":{"@id":"https:\/\/www.kasktas.com.tr\/en\/1915-canakkale-bridge-european-approach-viaduct-ground-treatment-and-pile-works\/#mainImage"},"datePublished":"2019-03-15T14:40:25+03:00","dateModified":"2019-03-15T15:19:57+03:00"},{"@type":"WebSite","@id":"https:\/\/www.kasktas.com.tr\/en\/#website","url":"https:\/\/www.kasktas.com.tr\/en\/","name":"KASKTA\u015e","description":"Kayar Kal\u0131p Altyap\u0131 Sondaj Kaz\u0131k ve Tecrit A.\u015e.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.kasktas.com.tr\/en\/#organization"}}]}},"aioseo_meta_data":{"post_id":"7612","title":"1915 CANAKKALE BRIDGE EUROPEAN APPROACH VIADUCT GROUND TREATMENT AND PILE WORKS | #site_title","description":"Following the successful completion of European and Asian Anchor Block excavation support works......","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2021-02-02 10:45:27","updated":"2025-06-22 03:45:03","seo_analyzer_scan_date":null},"acf":[],"_links":{"self":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts\/7612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/comments?post=7612"}],"version-history":[{"count":0,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/posts\/7612\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/media\/7621"}],"wp:attachment":[{"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/media?parent=7612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/categories?post=7612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kasktas.com.tr\/en\/wp-json\/wp\/v2\/tags?post=7612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}