Within the scope of Mecca Development Project Phase-1 of Jabal Al Ka’aba Project was completed between 2003 and 2004. Besides slope stability project of the rock stabilization works in Phase 2 of the Jabal Al Ka’aba Project was also designed and carried out by Kasktaş. The project consists of permanent rock anchors, rock bolt and shotcreting works. Before commencement of the works, a number of anchor proof tests were carried out to verify the anchor loads.

Project Description

Jabal Al Ka’aba Project Phase 2

  • Engineering

Project Features

Client
Abdul Latif Jameel Real Estate
Key Quantities
Rock Bolt 12,436 m
Shotcrete 10,111 m2
Rock Anchor 12,764 m
Project Duration
Start Date 10.09.2014
Finish Date Ongoing Project
Duration Ongoing Project

Location

Mecca, Saudi Arabia

 

 

Gallery

Related Projects

МАSAR ПРОЕКТ СТ-06 СКВАЖИННЫЕ ЗАВОДЫ

МАSAR ПРОЕКТ...

Completed Projects Deep...
ПРОЕКТ МАСАР ПАКЕТ A-B УСИЛИТЕЛЬНЫЕ РАБОТЫ

ПРОЕКТ МАСАР...

Asia Completed Projects...
СТРОИТЕЛЬНЫЕ РАБОТЫ NCMS TOWER

СТРОИТЕЛЬНЫЕ...

Asia Completed Projects...
ДЖАБАЛ-АЛЬ-КААБА 3-Й ЭТАП УСТОЙЧИВОСТИ НА СКЛОНЕ

ДЖАБАЛ-АЛЬ-КААБА...

Asia Completed Projects...