Üsküdar Underground Car Park

Üsküdar Underground Car Park

The contract for the Hakimiyeti Milliye Bazaar and Underground Car Park Project has been signed with PLT İnş. San. ve Tic. A.Ş. Within the scope of the project; 15,600 m2 of Diaphragm Wall and 7,000 m of Top-Down Pile works
Подробнее
Mandarin Oriental Bosphorus Hotel Project

Mandarin Oriental Bosphorus Hotel Project

Mandarin Oriental Bosphorus Project Shoring and Foundation Works is an ESTA Gayrimenkul investment and the contract has been signed with Yapı Merkezi. Within the scope of the project; there are 21,600 m2 of Diaphragm Wall; 6,000 m of Pre-stressed Anchor;
Подробнее
Bahçeşehir University Education Building Project

Bahçeşehir University Education Building Project

A total of 7000 m2 diaphragm wall and 700 m2 baretta pile was constructed within the scope of Bahçeşehir University Education Building Project, which was started in October 2017. The project site in Besiktas is next the shoring line of
Подробнее
Ferko Line Office and Hotel Project

Ferko Line Office and Hotel Project

The shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding
Подробнее
Alarko Kabataş Construction Site, Shoring Works of NATM, TBM and Turnout Shaft

Alarko Kabataş Construction Site, Shoring Works of NATM, TBM and Turnout Shaft

Within the scope of Kabataş-Mecidiyeköy-Mahmutbey Subway Project, shoring works of NATM, TBM and Turnout shaft in Kabataş, Istanbul has been carried out. The excavation depth of these three shafts vary between 43.10 m to 45.4 m and they are very
Подробнее
Eurasia Tunnel — Istanbul Strait Road Tube Crossing Project

Eurasia Tunnel — Istanbul Strait Road Tube Crossing Project

Within the scope of Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures called as transition boxes and prepared
Подробнее
NEF Projects

NEF Projects

NEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed.  Within the content of NEF 11 Project 5,500 m
Подробнее
Metropol Ataşehir Project

Metropol Ataşehir Project

2,650 m Barette piles were constructed within the content of the Metropol Istanbul Project, one of the highest buildings in Europe with a 250-meter skyscraper.    
Подробнее
Levent Zorlu Project

Levent Zorlu Project

Four (4) different shoring systems of Zorlu Levent Project with 20 m to 27 m excavation depth were designed by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding structures and
Подробнее
Tuzla Sedef Shipyard

Tuzla Sedef Shipyard

In this project, where the employer is Sedef Gemi İnşaat, a total of 168,000 m Jet Grout Column and 35,000 m Bored Pile were installed in Tuzla Sedef Shipyard between 2005-2008.    