• News
  • About Us
    • History
    • Publication List
    • Design & Engineering
  • Vision & Values
  • Health, Safety & Environment
  • Our Activities
    • Deep Foundations
    • Deep Excavations
    • Slope Stability
    • Soil Improvement
    • Marine Works
    • Special Applications
  • Quality Management
  • Machinery & Equipment
  • Projects
  • Quick Links
    • Contact Us
    • Career
    • Privacy Policy
    • Terms of Use
    • ENKA BIST Stock Exchange
  •  TURKISH
  •  RUSSIAN
  •  ARABIC

Site Search
KASKTAŞ
  • MENU
  • News
  • About Us
    • History
    • Publication List
    • Design & Engineering
  • Vision & Values
  • Health, Safety & Environment
  • Our Activities
    • Deep Foundations
    • Deep Excavations
    • Slope Stability
    • Soil Improvement
    • Marine Works
    • Special Applications
  • Quality Management
  • Machinery & Equipment
  • Projects
  • Quick Links
    • Contact Us
    • Career
    • Privacy Policy
    • Terms of Use
    • ENKA BIST Stock Exchange
  • TURKISH
  • RUSSIAN
  • ARABIC

Maad Hotel Towers, Buraidah Storm Water Project, King Abdulaziz Road Project Zone 5 and Tahliyah Underpass Project

Home| Deep Excavations| Maad Hotel Towers, Buraidah Storm Water Project, King Abdulaziz Road Project Zone 5 and Tahliyah Underpass Project

13
May, 2020
By Engin Kurtkaya
Maad Hotel Towers, Buraidah Storm Water Project, King Abdulaziz Road Project Zone 5 and Tahliyah Underpass Project
  • Deep Excavations,Deep Foundations,General

Maad Hotel Towers Project

 

The 1st phase of the Maad Hotel Towers Project, which is located on Ibrahim Al-Khalil Street, directly accessible to the Haram, in Makkah Al-Mukarramah, comprised of the rock stabilization works and was completed in 2018. The contract for the 2nd phase of the same project, which covers the North side rock stabilization works, has been signed with Maad International Company. The project consists of 21 hotels and aims to be able to house up to 22,000 pilgrims during peak seasons. Within the scope of the project, there is 10,500 m of rock bolt installation. The project is planned to be completed in 90 days.

 

Buraidah Storm Water Project

 

The project consists of the shoring works for the safe excavation of the Mashtal and Naqae Water Pump Stations within the scope of the Buraidah Storm Water Project, which is located in Al Qassim Region, Buraidah. The contract has been signed with Saudi Services for Electro Mechanic Works (SSEM) Company. The project of both sites includes the installation of berliner wall and dewatering system, as well as operating and maintenance of it.

 

King Abdulaziz Road Project – Zone 5

 

The King Abdulaziz Road Project, located in Makkah, was started with Stretch 4, Zone 9 which includes the design and construction of the shoring works to protect 700 mm water pipe, in 2019. The contract for the Zone 5, which comprises of the temporary and permanent shoring works during culvert excavation to ensure the stability of Umm Al Qura road that is connected to the Haram, has been signed with Nesma & Partners Contracting Co. The project includes installations of berliner wall, temporary and permanent anchor, rock bolt and shotcrete works.

 

Tahliyah Underpass Project

 

The underpass project has been launched in order to reduce the heavy traffic at the junction of Tahliyah Street and Medina Road in Jeddah. The soil improvement works comprise of the design and implementation of bottom plug by means of tangent jet grouting to form an impervious blanket. The purpose of bottom plug is to minimize the ground water for the underpass excavation and protection of the existing buildings and foundations of the Medinah Road Bridge. The project for soil improvement works has been designed by Kasktaş. The contract for the Jet Grout column installation has been singed with Advanced Construction Company. Within the scope of the project, 45% of the jet grout plug installations of 2 m length on 12,000 m2 area, has been completed by the end of March 2020.

About Engin Kurtkaya

About Us

  • News
  • History
  • Design & Engineering
  • Publication List
  • Representative Offices

Vision & Values

  • Vision & Values

HSE, Quality & Machinery

  • Health, Safety & Environment
  • Quality Management
  • Machinery & Equipment

Our Activities

  • Deep Foundations
  • Deep Excavations
  • Marine Works
  • Slope Stability
  • Soil Improvement
  • Special Applications

Quick Links

  • Contact Us
  • Career
  • Representative Offices
  • Privacy Policy
  • Terms of Use
  • ENKA BIST Stock Exchange

Recent Posts

  • Kastamonu İnebolu Port Renovation Project
  • Subcontractor of the Year – Kasktas Arabia NEOM Trojena Construction Site
  • October 16-18, 2024 ZMGM NATIONAL CONFERENCE & 3rd YOUNG GEOTECHNICAL ENGINEERS SYMPOSIUM
  • Almoosa Specialist Hospital Project Contract Signing Day
  • GAZİOSMANPAŞA YILDIZTABYA TOKİ HOUSING and MOSQUE PROJECT
  • JEDDAH ISLAMIC PORT SHORING WORKS
  • JK Era Residential Complex

Contact Us

 
  • Balmumcu Mah., Zincirlikuyu Yolu Sk. Enka A.Ş.
    No: 10, 34349,
    Beşiktaş Istanbul, Turkey
  • Phone: +90 (212) 274 58 42
    Fax: +90 (212) 266 33 93
  • kasktas@kasktas.com.tr
  • recruitment@kasktas.com.tr
    (Application for Employment & Internship)

Follow Us

KASKTAŞ is a subsidiary of ENKA.