The contract was signed with Ant Yapı in April for the shoring structure within the scope of the JK Era Residential Complex to be built in Moscow, Russia. Diaphragm wall will be constructed as the impermeable shoring system. As of mid-May 2023, the first diaphragm wall execution was performed. The remaining works are planned to be completed by September 2023.