• News
  • About Us
    • History
    • Publication List
    • Design & Engineering
  • Vision & Values
  • Health, Safety & Environment
  • Our Activities
    • Deep Foundations
    • Deep Excavations
    • Slope Stability
    • Soil Improvement
    • Marine Works
    • Special Applications
  • Quality Management
  • Machinery & Equipment
  • Projects
  • Quick Links
    • Contact Us
    • Career
    • Privacy Policy
    • Terms of Use
    • ENKA BIST Stock Exchange
  •  TURKISH
  •  RUSSIAN
  •  ARABIC

The construction works at the Çekmeköy – Sancaktepe – Sultanbeyli Metro Line, which is being built as an extension of the Üsküdar – Ümraniye – Çekmeköy Metro Project, have gained momentum in 2021. The contract for the S21B Switch Structure Diaphragm Wall Works within the scope of the CCS Metro Project has been signed with Doğuş – Yapı Merkezi – Özaltın Joint Venture. Following the completion of diaphragm wall works, shoring excavation has been successfully carried out. With a total excavation depth of 32 m, it is one of the deepest shoring system excavations performed in metro project in Türkiye. With this project, it is aimed to provide a much faster public transportation to Istanbul.

Project

CSS METRO PROJECT S21B SWITCH STRUCTURE

  • Engineering

Project Description

Client
Doğuş – Yapı Merkezi – Özaltın JV
Main Quantities
Diaphragm Wall
Duration
Start Date15.09.2021
Finish Date13.02.2022
Duration6 months

Konum

Turkey
[wpgmappity id=”2″]

 

 

İlgili Projeler

Site Search
KASKTAŞ
  • MENU
  • News
  • About Us
    • History
    • Publication List
    • Design & Engineering
  • Vision & Values
  • Health, Safety & Environment
  • Our Activities
    • Deep Foundations
    • Deep Excavations
    • Slope Stability
    • Soil Improvement
    • Marine Works
    • Special Applications
  • Quality Management
  • Machinery & Equipment
  • Projects
  • Quick Links
    • Contact Us
    • Career
    • Privacy Policy
    • Terms of Use
    • ENKA BIST Stock Exchange
  • TURKISH
  • RUSSIAN
  • ARABIC

About Us

  • News
  • History
  • Design & Engineering
  • Publication List
  • Representative Offices

Vision & Values

  • Vision & Values

HSE, Quality & Machinery

  • Health, Safety & Environment
  • Quality Management
  • Machinery & Equipment

Our Activities

  • Deep Foundations
  • Deep Excavations
  • Marine Works
  • Slope Stability
  • Soil Improvement
  • Special Applications

Quick Links

  • Contact Us
  • Career
  • Representative Offices
  • Privacy Policy
  • Terms of Use
  • ENKA BIST Stock Exchange

Recent Posts

  • KASKTAŞ Takes Its Place as a Gold Sponsor at ZMGM20 and GGM4
  • Kasktaş’s Impact on Global Projects in the First Half of 2026
  • Kasktaş to Exhibit at the 3rd Deep Foundations and Underground Infrastructure MENA Conference (DFUI)
  • 30,000 kN Capacity K-CELL Bi-Directional Load Test Successfully Completed at the Velux Konak Project
  • The Nassau Cruise Port Renewal and Expansion Project is Complete
  • Almoosa Specialist Hospital Project
  • Kastamonu İnebolu Port Renovation Project

Contact Us

 
  • Balmumcu Mah., Zincirlikuyu Yolu Sk. Enka A.Ş.
    No: 10, 34349,
    Beşiktaş Istanbul, Turkey
  • Phone: +90 (212) 274 58 42
    Fax: +90 (212) 266 33 93
  • kasktas@kasktas.com.tr
  • recruitment@kasktas.com.tr
    (Application for Employment & Internship)

Follow Us

KASKTAŞ is a subsidiary of ENKA.