Multifunctional Complex Building and Social Facilities are planned to be built in Moscow City, Shelepihinskaya Street. The contract was signed with Ant Yapı on June 15, 2021 for the shoring works within the scope of the project. The project consists of 6.400 m of Bored Pile, 4.600 m of Pipe Pile, 2.900 m of Temporary Soil Anchor and 236 nos of Pile Base Injection works.
As of June 21, pipe pile works and June 28, the execution of test piles have commenced. All works within the scope of the project are planned to be completed by the end of January 2022.