The contract was signed with Enka Construction Ltd. Iraq Branch on May 27, 2020 for the Bored Pile constructions within the scope of the Port of Umm Qasr Basra Multi-Purpose Container Terminal Yard, located in Iraq. The project consists of 3,900 m of Bored Pile.
Bored Pile construction has started on September 27, 2020 and 3,100 m of bored pile work has been completed as mid of January 2021. The execution is planned to be completed by March 2021.