General

Kastamonu İnebolu Port Renovation Project

Kastamonu İnebolu Port Renovation Project

The renovation work for the port owned by Eti Bakır, located in the İnebolu district of Kastamonu, is progressing at full speed. Within the scope of the project, secant piles and bored piles have been designed to strengthen the port’s Continue reading
Learn more
Subcontractor of the Year – Kasktas Arabia NEOM Trojena Construction Site

Subcontractor of the Year – Kasktas Arabia NEOM Trojena Construction Site

Kasktas Arabia has been honoured with the “Subcontractor of the 2024 Year” award for its outstanding performance in the NEOM Trojena Time Travel Tunnel Project. This prestigious award highlights our excellence in project management, innovative solutions, high-quality standards, and collaboration Continue reading
Learn more
October 16-18, 2024 ZMGM NATIONAL CONFERENCE & 3rd YOUNG GEOTECHNICAL ENGINEERS SYMPOSIUM

October 16-18, 2024 ZMGM NATIONAL CONFERENCE & 3rd YOUNG GEOTECHNICAL ENGINEERS SYMPOSIUM

We participated in the ZMGM19 Conference and GGM3 Symposium held at Hacettepe University Beytepe Campus between October 16 and 18. At these important events, Kasktaş General Manager Alp Gökalp delivered a presentation titled “Design and Application Examples of Port and Continue reading
Learn more
Almoosa Specialist Hospital Project Contract Signing Day

Almoosa Specialist Hospital Project Contract Signing Day

Kasktaş signed contract with Almoosa Health Group for the construction of Almoosa Specialist Hospital in Al Khobar, Saudi Arabia. The project consists of deep excavation and shoring works, including anchored diaphragm wall, bored pile, soil improvement, excavation, and dewatering activities. Continue reading
Learn more
GAZİOSMANPAŞA YILDIZTABYA TOKİ HOUSING and MOSQUE PROJECT

GAZİOSMANPAŞA YILDIZTABYA TOKİ HOUSING and MOSQUE PROJECT

The contract has been signed with Okçuoğlu İnşaat and OGD Mimarlık for the shoring works of the Yıldıztabya TOKI Housing and Mosque Project, which will be implemented within the framework of urban transformation in Gaziosmanpaşa district, Istanbul. The contract consists Continue reading
Learn more
JEDDAH ISLAMIC PORT SHORING WORKS

JEDDAH ISLAMIC PORT SHORING WORKS

The contract has been signed with PC Marine Services for the shoring works of the Jeddah Islamic Port Berths 26 to 31 Rehabilitation Project. Within the contract, there are bored pile, SBMA anchor and Tie-Rod works. Jeddah Islamic Port is Continue reading
Learn more
JK Era Residential Complex

JK Era Residential Complex

The contract was signed with Ant Yapı in April for the shoring structure within the scope of the JK Era Residential Complex to be built in Moscow, Russia. Diaphragm wall will be constructed as the impermeable shoring system. As of Continue reading
Learn more
MBE Metro Project TOKİ Station Shoring Works

MBE Metro Project TOKİ Station Shoring Works

Kasktaş continues to execute the TOKİ Station Shoring Works within the scope of the Mahmutbey – Bakçeşehir – Esenyurt Metro Line Project under construction by the Istanbul Metropolitan Municipality. In August, Kasktaş started to execute diaphragm wall and secant pile Continue reading
Learn more
18th National Conference on Soil Mechanics and Geotechnical Engineering

18th National Conference on Soil Mechanics and Geotechnical Engineering

Kasktaş took part as the Silver Sponsor in the 18th National Conference on Soil Mechanics and Geotechnical Engineering – ZMGM18 and the 2nd National Symposium of Young Geotechnical Engineers – GGM2, hosted by Erciyes University Civil Engineering Department on September Continue reading
Learn more
K-CELL: An Innovative Bi-Directional Load Test Method for Deep Foundations

K-CELL: An Innovative Bi-Directional Load Test Method for Deep Foundations

We are proud to announce the launch of our new product: “K-CELL “ “K-CELL”, is a Bi-Directional Static Axial Load Test, in which a compressive load test performed on deep foundations by pressurizing an embedded load cell into the pile, Continue reading
Learn more