BMT Container Terminal

The contract was signed with Enka Construction Ltd. Iraq Branch on May 27, 2020 for the Bored Pile constructions within the scope of the Port of Umm Qasr Basra Multi-Purpose Container Terminal Yard, located in Iraq.

Bored Pile construction has started on September 27, 2020 and is planned to be completed by March 2021.

Project Description

BMT Container Terminal

  • Engineering

Project Features

Client
Enka Construction Ltd. Iraq Branch
Key Quantities
Bored Pile 4,300 m
Project Duration
Start Date 27.09.2020
Finish Date Current