King Abdullah Economic City Solar Desalination Plant Project

The water supply for the on-going King Abdullah Economic City (KAEC); which is located on the shoreline of Red Sea, will be supported with the Solar Desalination Plant with a capacity of purifying 30,000 m3 of sea water for domestic use of the city. The contract for the Water Inlet Structure Secant Pile works within the scope of the project was signed with Akon International on August 1, 2019. Within the scope of the project; 2,900 m of 1000 mm diameter secant pile and dewatering drillings were completed between July 1 and October 1, 2019.

Project Description

King Abdullah Economic City Solar Desalination Plant Project

  • Engineering

Project Features

Client
Akon International
Key Quantities
Secant Pile 2,900 m
Project Duration
Start Date 01.07.2019
Finish Date 01.10.2019
Duration 3 Months

Location

Arabia

 

 

Related Projects

Masar Project ST 06 Bored Pile Works

Masar Project ST...

Completed Projects Deep...
BMT Container Terminal

BMT Container Terminal

Basrah Current Projects...
Nador Port Project

Nador Port Project

Current Projects Deep...
Masar Project Package A Shoring Works

Masar Project Package...

Asia Current Projects...