Rock stabilization works between axes W0+000.00 – W0+185.00 of Maad Hospitality Tower Project in Mecca were carried out by Kasktaş in 2018. The contract for the rock stabilization works between axes W0+185.00 – N0+340.00, which are the continuation of the project, was signed with Maad International Co. on June 30, 2020. The project includes 10,500 m of rock bolt.
Due to the Covid-19 epidemic, the construction was started in June and completed on October 1, 2020.
Project Description
Maad Hospitality Tower Project North Side
- Engineering
Project Features
Client
Maad International Co.
Key Quantities
Rock Bolt | 10,500m |
Project Duration
Start Date | 01.06.2020 |
Finish Date | 01.10.2020 |
Duration | 4 Mouths |
Location
Arabia