2,650 m Barette piles were constructed within the content of the Metropol Istanbul Project, one of the highest buildings in Europe with a 250-meter skyscraper.

Project Description

Metropol Ataşehir Project

  • Engineering

Project Features

Client
Varyap GAP
Key Quantities
Barette Pile 2,650 m
Project Duration
Start Date 01.06.2013
Finish Date 01.10.2013
Duration 4 Months

Location

Istanbul, Turkey

 

 