• 001

Albanian Motorway Project was undertaken by Enka and Bechtel in September, 2006. The Rreshen-Kalimash Motorway Project is a key connection between Durres Port, Albania’s primary harbor on the Adriatic Sea, and Kosovo. The Rreshen-Kalimash motorway’s main purpose is to serve as a faster and safer route through the mountainous region. Within the scope of the project, permanent anchors, mini piles and drainage drillings were completed by KASKTAŞ.

Project Description

Albanian Motorway Project

  • Engineering

Project Features

Client
ENKA Bechtel JV
Key Quantities
Permanent Anchor1,965 m
Mini Pile2,800 m
Drainage Drilling
Project Duration
Start Date01.02.2009
Finish Date01.08.2009
Duration6 Months

Location

Albania
[wpgmappity id=»10″]

 

 

Gallery

Related Projects

МАSAR ПРОЕКТ СТ-06 СКВАЖИННЫЕ ЗАВОДЫ

МАSAR ПРОЕКТ СТ-06 СКВАЖИННЫЕ ЗАВОДЫ

Completed Projects Deep Foundations Saudi Arabia
ПРОЕКТ МАСАР ПАКЕТ A-B УСИЛИТЕЛЬНЫЕ РАБОТЫ

ПРОЕКТ МАСАР ПАКЕТ A-B УСИЛИТЕЛЬНЫЕ...

Asia Completed Projects Deep Excavations Deep Foundations...
СТРОИТЕЛЬНЫЕ РАБОТЫ NCMS TOWER

СТРОИТЕЛЬНЫЕ РАБОТЫ NCMS TOWER

Asia Completed Projects Deep Excavations Deep Foundations...
ДЖАБАЛ-АЛЬ-КААБА 3-Й ЭТАП УСТОЙЧИВОСТИ НА СКЛОНЕ

ДЖАБАЛ-АЛЬ-КААБА 3-Й ЭТАП УСТОЙЧИВОСТИ...

Asia Completed Projects Deep Foundations Saudi Arabia