anemptytextlline
-
Проект реабилитации порта АктауAktau is Kazakhstan's main port on the Caspian Sea and serves as the major logistics base for the offshore oil fields. The ENKA-Bechtel joint venture signed the contract with Kazakhstan's Ministry of Transportation for the Aktau Port rehabiliation project. The...
-
Jeddah Hilton Hotel
anemptytextlline
Located on the Corniche Road in Jeddah, this project consists of a hotel building, function hall and apartment blocks constructed between 1995 and 2001. A total of 36,000 m of 100 cm diameter skin and base grouted bored piles were... -
Mostar Bridge
anemptytextlline
The historical Mostar Bridge collapsed on November 9, 1993 as a result of bombing during the civil war in the former state of Yugoslavia. Reconstruction of the bridge and the historical environment were performed under the supervision of the World... -
Poti Port Petroleum Products Storage and Handling Terminal Project
anemptytextlline
The Poti Sea Port is a major seaport and harbor of the eastern Black Sea coast at the mouth of the Rioni River in Poti, Georgia. 11,000 m Stone Column installation completed successfully by Kasktaş as a subcontractor of Üstay... -
Artvin Deriner Dam
anemptytextlline
The 670 MW Deriner Dam, located on the Çoruh River in the Eastern Black Sea Region, is the largest dam in Turkey and the fifth largest concrete dam in the world with a height of 247 m. Construction of dam... -
C&WP Topside Project
anemptytextlline
This project consists of the modernization and strengthening of quayside works; where petroleum platforms will be constructed. Ground improvement by stone column method was implemented under the unloading berth area; where extremely high loads were placed. In addition to 10,000... -
Tengiz & Munay Daria Projects
anemptytextlline
A total of 17,000 m reinforced concrete precast driven pile and 27,500 m2 sheet piles were driven by executed by KASKTAŞ. Project DescriptionTengiz & Munay Daria Projects Engineering Project Features Client Munay Daria Key Quantities R.C. Driven Pile 17,000 m Sheet Pile 27,500 m2 Tie Rods Installation 94 no. Project Duration Start... -
Oued Athmania Dam Project
anemptytextlline
Within the scope of the Oued Athmania Dam Project in Mila, 11,000 m of 650 mm diameter jet grout columns were performed, within the dam construction works, a total of 35,050 m of drilling for grouting and drainage, 5,300 m... -
Four Seasons Bosphorus Hotel
anemptytextlline
For the excavation of foundation excavation pit for the Four Seasons Bosphorus Hotel, located very close to Istanbul Bosphorus, an anchored piled wall shoring system was implemented with a depth of 18 m. In order to provide impermeability of shoring... -
Aramco Rabigh Development Project
anemptytextlline
In the content of Aramco Rabigh Development Project, a total of 22,000 m bore pile and 51,000 m stone column installation works were successfully completed. Project DescriptionARAMCO Rabigh Development Project Engineering Project Features Client Consolidated Contractors Company Key Quantities Bored Pile 22,000 m Stone Column 51,000 m Project Duration Start Date 01.06.2006 Finish... -
Esentai Park - Tower Building
anemptytextlline
Esentai Park Project covers, soil improvement by using jet grout columns of foundations of the tower; anchor and rock bolt installation works and shotcreting wokrs for the execution of the excavation pit. ENKA was the employer of the project and... -
White Square Office Center Project
anemptytextlline
The White Square Office Center, whose client was the AIG Lincoln-Coalco Partnership, consists of 3 office buildings near the Belaruskaya Subway Station and covers a total construction area of 109,000 m2. A total of 4,700 m of bored pile installation... -
Mirax Plaza
anemptytextlline
A total of 11,000 m of bored piles; varying from 1,000-1,200 mm diameter were installed at the Mirax Plaza Project. This project consists of the construction of two high-rise buildings, 41 and 47 stories tall. The piling works began at... -
Shakhtar Donetsk Stadium
anemptytextlline
The new Stadium, located in Leninsky Komsomol Park, Donetsk, home of FC Shakhtar and is the first stadium in Ukraine to aspire to UEFA and FIFA 5-star status with seating capacity for 50,000 spectators. The project has seen the driving... -
Jeddah King Abdul Aziz International Airport
anemptytextlline
The project, located within King Abdul Aziz Airport area, includes the expansion of existing domestic and international passenger terminals. Bored pile installation works were completed in two different sites, the north and south terminals. Project DescriptionJeddah King Abdul Aziz International Airport... -
Medina Central Area Development Project
anemptytextlline
Since the middle of the 1980s the Prophet’s Mosque (Masjid Al Haram Al Sharif, Masjid An-Nabawi) in Medina has been expanded with the area around the mosque developed by The Medina Central Area Development Project. In accordance with this ongoing... -
Tsvetnoy Multifunctional Complex
anemptytextlline
In Tsvetnoy Project, a local subcontractor was started geotechnical works. However, due to the excessive unpredictable displacements encountered, KASKTAŞ was involved in the Project. Within the content of the remedial measures, a total of 550 m steel pipe pile, 1,140... -
On-Shore Processing Facility, Sakhalin Island
anemptytextlline
On the northeastern coast of Sakhalin Island in the Russian Federation, a total of 100,000 m of 500-600 mm diameter bored pile and 2,000 m2 of sheet pile wall were executed in three phases at the On-shore Processing Facility Project... -
Tuzla Sedef Shipyard
anemptytextlline
In this project, where the employer is Sedef Gemi İnşaat, a total of 168,000 m Jet Grout Column and 35,000 m Bored Pile were installed in Tuzla Sedef Shipyard between 2005-2008. Project DescriptionTuzla Sedef Shipyard Engineering Project Features Client Sedef Gemi İnşaat Key Quantities Bored Pile 35,000... -
Paveletskaya Underground Complex
anemptytextlline
Paveletskaya Square Project is an underground trade center to be built on the Paveletskaya square of Moscow city center. Our company has undertaken the construction of diaphragm wall, bored pile and ground improvement works within the content of the Project.... -
Albanian Motorway Project
anemptytextlline
Albanian Motorway Project was undertaken by Enka and Bechtel in September, 2006. The Rreshen-Kalimash Motorway Project is a key connection between Durres Port, Albania’s primary harbor on the Adriatic Sea, and Kosovo. The Rreshen-Kalimash motorway’s main purpose is to serve... -
Algeria Motorway Project
anemptytextlline
This motorway is a major national project being undertaken by the Algerian government. Traversing the country, the motorway will stretch from the Tunisian border in the east to the Moroccan border in the west, for a total distance of 1,200... -
Tula Cement Factory
anemptytextlline
The Tula Cement Plant belonging to Heidelberg Cement was located in Tula, Russia. Under the main contactor Betatek, KASKTAŞ successfully completed a total of 37,000 m of bored piles with various diameter and length. Before execution of piles, a number... -
Vyborg Compressor Station
anemptytextlline
In the content of Nord Stream Project of Gazprom 6,500 m bored piles constructed. The city of Vyborg was built on a volcanic structure, which makes the project important. Massive granite and granodiorite type rocks were observed throughout the region.... -
White Garden Project
anemptytextlline
The White Garden Project, whose client is Ant Yapı, consists of 2 number of office buildings and it was planned as the continuation of the White Square Project. Within the scope of the project, 272 Top Down pile were successfully... -
Al Jawhara Tower Project
anemptytextlline
The 40-storey Al Jawhara Tower; which is located on the Corniche Road in Jeddah; consists of luxurious penthouses and apartments. A total of 3,600 m, 60 cm and 80 cm diameter secant piles; 10,750 m 90 cm and 120 cm... -
Borusan Gemlik Projects
anemptytextlline
A total of 21,860 m of bored piles and 17,780 m of DSM Columns were installed at the Bursa Gemlik ERW Pipe Plant of Borusan Mannesmann. Also within the scope of Gemlik Port Facilities Renovation and Consolidation Project 34,000 m... -
Levent Zorlu Project
anemptytextlline
Four (4) different shoring systems of Zorlu Levent Project with 20 m to 27 m excavation depth were designed by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding structures and... -
Lamar Towers
anemptytextlline
The Lamar Towers in Jeddah; which is 50 m away from the Red Sea; consist of two multi functional towers and will be one of the tallest buildings in Jeddah at a 335 m height. The podium structure consists of... -
Multi-Purpose Public Buildings in Smolenskaya
anemptytextlline
Diaphragm wall with a thickness of 600 mm and 1,000 mm diameter top-down bored pile construction works were successfully completed within the scope of the Smolenskaya Multi-Purpose Public Building Project; which consists of a 12-storey shopping center and office buildings.... -
İzmit Tüpraş Refinery Upgrading Projects
anemptytextlline
Within the scope of Izmit Tüpraş Refinery Upgrading Projects, soil improvement works were completed under 5 different Employers. Between 2011 and 2012, a total of 162,000 m Jet Grout, 21,500 m Foundation Piles and 3,800 m Barette Piles were installed... -
Kashagan Oil Field Development
anemptytextlline
The Kashagan field is located in the Kazakhstan sector of the Caspian Sea and extends over a surface area of approximately 75 kilometers by 45 kilometers. The reservoir lies some 4,200 meters below the shallow waters of the northern part of the... -
Metro Bank Project
anemptytextlline
A total of 18,285 m2 Diaphragm Wall, 3,150 m Grout Drilling and 90 m3 Grouting works were completed within the content of the Metrobank, one of the biggest banks of the Russian Federation, Project. Project DescriptionMetro Bank Project Engineering Project Features Client Alto-Assets Key Quantities Diaphragm... -
Ford Otosan Automobile Plant
anemptytextlline
Within the scope of Ford Otosan Automobile Factory in Gölcük, bored piles, jet grout columns and stone columns were successfully executed under the foundations of the different strcutures. 13 months after the project started; in other words when 90% of... -
Jeddah Storm Water Drainage Project
anemptytextlline
This project was designed in order to control and divert storm water towards to the sea. The whole project consists of 8 Packages with 5 Dams and 3 Channels/Drainage and outfalls. The New Drainage system runs at a stretch of... -
Kuntsevo Multifunctional Trade & Business Center
anemptytextlline
Kuntsevo Multifunctional Trade & Business Center was built in Moscow with an area of 26,800 m2. The 25 m deep excavation pit was performed by a deep shoring system consisting of 45 m deep and D=80 cm diaphragm wall supported... -
Metropol Ataşehir Project
anemptytextlline
2,650 m Barette piles were constructed within the content of the Metropol Istanbul Project, one of the highest buildings in Europe with a 250-meter skyscraper. Project DescriptionMetropol Ataşehir Project Engineering Project Features Client Varyap GAP Key Quantities Barette Pile 2,650 m Project Duration Start Date 01.06.2013 Finish Date 01.10.2013 Duration 4 Months LocationIstanbul, Turkey Gallery... -
4×125 Najybia Gas Turbine Power Plant
anemptytextlline
Najybia Power Plant Project was successfully completed by ENKA. The project, located near Basrah, is part of a master plan developed and implemented by Republic of Iraq’s Ministry of Electricity to increase the power generation capacity to meet the rapid... -
İzmit Bay Suspension Bridge Project
anemptytextlline
Osman Gazi Bridge Projects Within the scope of the Osman Gazi Bridge Project; 4 different works; such as diaphragm wall works at South Anchorage Block and South Approach Viaducts, sheet pile driving and extracting works at Dry Dock, soil improvement by... -
Western High Speed Diameter Motorway Project
anemptytextlline
St. Petersburg Western High-Speed Diameter Motorway Project is one of the most important public-private partnership (PPP) agreement realized in Russia up to now. Within the scope of the Project a series of bridges combining the islands and a 47 km long... -
NEF Projects
anemptytextlline
NEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed. Within the content of NEF 11 Project 5,500 m... -
Eroğlu Skyland Project
anemptytextlline
Skyland Project consists of 3 number of tower (Offices, Residences and Hotel) and a shopping with wellness center. This is the deepest excavation project with its 76 m depth supported with anchors not only in Europe but also in the... -
Moscow International Business Center
anemptytextlline
Moscow City, or the Moscow International Business Center by its full name, is situated four kilometers west of the Kremlin on Krasnopresnenskaya (an embankment of the Moscow River), and is one of the largest and most ambitious construction projects. The... -
New Ashgabat International Airport
anemptytextlline
The new Ashgabat International airport was built to replace existing airport facilities in order to respond to the rapidly growing domestic and international passenger traffic in Turkmenistan. Within the scope of the project, its main contractor was Polimeks, 120,000 m... -
Eurasia Tunnel - Istanbul Strait Road Tube Crossing Project
anemptytextlline
Within the scope of Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures called as transition boxes and prepared... -
Mecca Holy Haram Development Project
anemptytextlline
The increasing number of pilgrims, Mecca receives, has necessitated expansion of the Holy Mosque (Al Masjid Al Haram), as well as development projects located in the holy sites and several high-rise tower projects to accommodate the greater influx. Since its first... -
İzmir Aliağa Star Refinery Projects
anemptytextlline
İzmir Aliağa Star Refinery Projects Within the scope of İzmir Aliağa Refinery Project; which is the largest private sector investment project in Turkey, several sub-contract works have been carried out under different main contractors. Under these subcontracts; Terrace 5&6 Permanent SBMA Anchor... -
Alarko Kabataş Construction Site, Shoring Works of NATM, TBM and...
anemptytextlline
Within the scope of Kabataş-Mecidiyeköy-Mahmutbey Subway Project, shoring works of NATM, TBM and Turnout shaft in Kabataş, Istanbul has been carried out. The excavation depth of these three shafts vary between 43.10 m to 45.4 m and they are very... -
Jabal Al Ka’aba Project Phase 2
anemptytextlline
Within the scope of Mecca Development Project Phase-1 of Jabal Al Ka'aba Project was completed between 2003 and 2004. Besides slope stability project of the rock stabilization works in Phase 2 of the Jabal Al Ka'aba Project was also designed... -
Riyadh Metro Project Piling and Shoring Works
anemptytextlline
Riyad Metro - Line Number 3 Within the content of the Riyad Metro Project, one of the largest construction projects in Saudi Arabia, bored piles with 120 cm and 150 cm diameter in the Western Stretch region viaducts were completed. The... -
Mahall Bomonti İzmir Project
anemptytextlline
The Mahall Bomonti İzmir Project under construction is located at Bayraklı region in İzmir. The deep foundation system and shoring design of Mahall Bomonti İzmir Project; which has a maximum 20 m of excavation depth and partially under ground water... -
Ferko Line Office and Hotel Project
anemptytextlline
The shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding... -
Bahçeşehir University Education Building Project
anemptytextlline
A total of 7000 m2 diaphragm wall and 700 m2 baretta pile was constructed within the scope of Bahçeşehir University Education Building Project, which was started in October 2017. The project site in Besiktas is next the shoring line of... -
Michurinsky Bored Pile Project
anemptytextlline
Within the scope of the Michurinsky residency project in Moscow, 17,400 m of Bored Pile work has been completed. The completed piles have the following properties: After the concrete has been poured into each pile, a precast concrete pile is driven into... -
Mandarin Oriental Bosphorus Hotel Project
anemptytextlline
Mandarin Oriental Bosphorus Project Shoring and Foundation Works is an ESTA Gayrimenkul investment and the contract has been signed with Yapı Merkezi. Within the scope of the project; 21,600 m2 of Diaphragm Wall; 6,000 m of Pre-stressed Anchor; 10,000 m of... -
Shelepihinskaya Project
anemptytextlline
The contract for the Multifunctional Residence and Facility Complex, located in Moscow, has been signed with ANT YAPI. Within the scope of the project; 8,500 m of Bored Pile with Ø 100-150 cm diameters has been completed. Project DescriptionShelepihinskaya Project Engineering Project... -
Multi-storey Car Park Project
anemptytextlline
The contract for the Multi-storey Car Park Project, which is located in MIBC Moscow-City Ring 3 Transportation Road, has been signed with ENKA CONSTRUCTION. Within the scope of the project; 3,500 m of Bored Pile with Ø 62 cm diameter... -
Krasnopresnenskaya Project
anemptytextlline
Within the scope of the contract signed with OOO BOES CONSTRUCTION for the Multifunctional Complex Project Bored Pile Works; 16,500 m of Bored Pile with Ø 88-100 cm diameters has been completed. The project is located in the Krasnopresnenskaya Region... -
Filicity Project
anemptytextlline
The contract of Multifunctional Residence Project Bored Pile Works, signed with ESTA CONSTRUCTION; 11,000 m of Bored Pile with Ø 120 cm diameter has been completed. The project is located in Bagrationovskaya Region, Moscow. Project DescriptionFilicity Project Engineering Project Features Client ESTA CONSTRUCTION Key Quantities Bored... -
King Abdulaziz Roadway Project
anemptytextlline
King Abdulaziz Roadway Project, whose construction is ongoing in the Mecca, Saudi Arabia, consists of the construction of a new bridge that is connected to the Jeddah-Mecca Motorway. Within the scope of the project; 300 m of Bored Pile with... -
Çanakkale 1915 Bridge Project / European Anchor Block Excavation
anemptytextlline
The contract of the Çanakkale 1915 Bridge European Anchor Block Excavation Works has been signed with DLSY JV. Within the scope of the project which consists of Kınalı-Tekirdağ-Çanakkale-Savaştepe Highway; 5,400 m of Secant Pile; 9,500 m of Rock Bolt, Shotcrete,... -
Iraq Dhi Qar and Samawa Combined Cycle Power Plant Project
anemptytextlline
The contract of the Iraq Dhi Qar 750 MW Combined Cycle Power Plant Project, which consists of the installation of the bearing foundation pile, has been signed with ENKA CONSTRUCTION. Within the scope of the project; 18,000 m of Bored... -
Maad Hospitality Tower Project
anemptytextlline
The contract for the Maad Hospitality Tower Project, which is built in Mecca, Saudi Arabia, has been signed in April 2018. The project consists of the rock bolt and shotcrete works which are executed on the existing slope surface. Rock bolt... -
Dimitrovsky Project
anemptytextlline
The contract of the MR Group Multifunctional Complex Project Bored Pile Works has been signed with ANTTEQ. Within the scope of the project; 13,000 m of Bored Pile work has been completed. Project DescriptionDimitrovsky Project Engineering Project Features Client ANTTEQ Key Quantities Pile Work 10,000 m Project Duration Start... -
Domodedovo Airport Project
anemptytextlline
The contract for the Domadedova Airport Reconstruction Project in Moscow has been signed with ANT YAPI San. ve Tic. A.Ş. Within the scope of the project; 8,500 m of Bored Pile has been completed as Stage 1 and 2. Project DescriptionDomodedovo... -
Çanakkale 1915 Bridge Project / Asian Anchor Block Excavation
anemptytextlline
The contract for the Çanakkale 1915 Bridge Asian Anchor Block Excavation Works, which is in the scope of the Kınalı-Tekirdağ-Çanakkale-Savaştepe Highway Project, has been signed with DLSY JV in August 8th, 2018. Within the scope of the project; 6,500 m... -
Üsküdar Underground Car Park
anemptytextlline
The contract for the Hakimiyeti Milliye Bazaar and Underground Car Park Project has been signed with PLT İnş. San. ve Tic. A.Ş. Within the scope of the project; 15,600 m2 of Diaphragm Wall and 7,000 m of Top-Down Pile works... -
Action Development Project
anemptytextlline
Within the scope of the contract signed with ANT YAPI for the Office and Hotel Project Diaphragm Wall and Top-Down Bored Pile Works; 6,000 m2 of Diaphragm Wall and 2,000 m of Bored Pile works have been completed. The project... -
1915 Canakkale Bridge European Approach Viaduct Ground Treatment And Pile...
anemptytextlline
Following the successful completion of European and Asian Anchor Block excavation support works, the contract for the construction of 365 m long European Approach Viaduct ground treatment and piling works has been signed with the consortium DLSY (Yapı Merkezi-Daelim-SK-Limak). Within the... -
Sadoviy Kvartal Deep Excavation Support Project
anemptytextlline
Within the scope of Stage 3 and 5 construction works of Sadoviy Kvartal Multifunctional Residence with Underground Car Park Project located in Hamovniki Region, which is one of the most prestigious district of Moscow, there are diaphragm wall and jet... -
Saharova Red 7 Project Foundation Pile Works
anemptytextlline
Located at the intersection of the Clasiyo and Akademiceskya Streets in Moscow, Saharova RED 7 Project consists of luxurious residences, 4 underground car park floors and trade centers. Within the scope of the project, all the existing reinforced concrete constructions... -
СТРОИТЕЛЬСТВО ИЛИМСКОЙ БУМАЖНОЙ ФАБРИКИ
anemptytextlline
Решением Совета Министров Советского Союза в 1973 году Группа «Илим» начала строительство лесопромышленного комплекса в Усть-Илимске (Иркутская область) Сибирского региона. Группа «Илим» производит 75% годовой потребности Российской Федерации в целлюлозе и входит в десятку крупнейших бумажных комбинатов мира. В Усть-Илимске... -
ВОДОПРОВОД ДОРОЖНОГО ПРОЕКТА KING ABDULAZIZ END OF STRETCH-09
anemptytextlline
В рамках проекта дороги KING ABDÜLAZİZ, 09 июля 2019 года был подписан контракт с гензаказчиком Nesma & Partners на строительство грунтовых анкеров и шпунтового ограждения, спроектированных нами для предотвращения деформации 700-миллиметрового трубопровода чистой воды, питающего Гарем. В проект входит грунтовые... -
ПРОЕКТ EXIT-10
anemptytextlline
Компания Saudi Entertainment Ventures (SEVEN), основанная Саудовским общественным фондом в 2017 году, создает зоны социальной активности по всей стране. 20.10.2019 был подписан контракт с El Seif Engineering на устройство грунтовых свай и цементацию в рамках проекта Exit-10 SEVEN Entartainment Clusters.... -
ПРОЕКТ СТРОИТЕЛЬСТВА ДОРОГИ KING ABDULAZIZ END OF STRETCH 4
anemptytextlline
21.05.2019 подписан контракт с подрядной фирмой Nesma & Partners на выполнение работ по креплению концов туннелей в рамках Проекта King Abdulaziz Road. Из-за близости проекта к Гарему и расположения водопровода Замзам в пределах проектной площадки бетон не должен был достигать... -
ПРОЕКТ ПО СТРОИТЕЛЬСТВУ СОЛЕООЧИСТИТЕЛЕЙ, HAQL
anemptytextlline
В рамках проекта строительства опреснительных установок, организованного Министерством окружающей среды Саудовской Аравии, планируется построить в общей сложности 8 опреснительных установок на побережье Красного моря. С фирмой Peaks Construction & Maintenance Co. ООО контракт был подписан 01.10.2019. В рамках проекта общая... -
ПРОЕКТ ОТЕЛЯ BVLGARI
anemptytextlline
11.10.2019 подписан контракт с компанией Antteq на строительство поперечных и нисходящих свай в рамках проекта гостиницы Bulgary в Москве. В рамках проекта предусмотрено изготовление 7 500 м буросекущих свай и 2 400 м и топдаун свай. Производство, начатое 11.10.2019, было... -
ПРОЕКТ КОРОЛЯ АБДУЛЛА ЭКОНОМИЧЕСКИЙ ГОРОД ЗАВОД ПО ОБРАБОТКЕ СОЛНЕЧНОЙ ЭНЕРГИИ
anemptytextlline
Для удовлетворения будущих потребностей в воде экономического города короля Абдаллы, который строится на побережье Красного моря в Саудовской Аравии, осуществляется проект установки по очистке солнечной энергии. Станция очистки морской воды, построенная в рамках проекта, будет обеспечивать потребности города в воде... -
КОМПЛЕКСНОЕ ЗДАНИЕ «СЕРДЦЕ СТОЛИЦЕ» 2. ЭТАП ПРОЕКТА
anemptytextlline
Проект строительства многофункционального комплекса «Сердце Столицы», расположенный в городе Москва, на улице Шелепихинская, 24.04.2019 подписал контракт с «Ant Yapı» на производство буронабивных свай, анкеров и шпунтовой ограждения . По проекту - 2300 м буронабивных свай; 9 200 м анкеров и... -
ПРОЕКТ ПО СТРОИТЕЛЬСТВУ СОЛЕОЧИСТИТЕЛЬНЫХ ЗАВОДОВ, УМЛУЙ
anemptytextlline
В рамках проекта строительства опреснительных установок, организованного Министерством окружающей среды Саудовской Аравии, планируется построить в общей сложности 8 опреснительных установок на побережье Красного моря. Один из этих восьми проектов, очистные сооружения, расположенные в районе Умлуй, будут обеспечивать потребности в воде... -
ОЛСУФЕВСКИЙ КОМПЛЕКСНЫЙ СТРОИТЕЛЬНЫЙ ПРОЕКТ
anemptytextlline
25.03.2019 подписан контракт с ANTTEQ на изготовление буронабивных свай в рамках проекта строительства многофункционального комплекса «Олсуфьевский», который строится в Москве. Строительство 1600 м буронабивных свай в рамках контракта.Строительство началось 10.04.2019 и завершилось 12.07.2019. Project DescriptionOlsufevsky Multifunctional Complex Project Engineering Project Features Client ANTTEQ Key Quantities Буронабивные... -
ЭТАП-2 ЖИЛИЩНОГО ПРОЕКТА МУЛКОМОНЛИ
anemptytextlline
В 08.04.2019 был подписан контракт с компанией Antteq на производство буронабивных свай в рамках инвестиционного проекта Жилой проект Мулкомонлы в Москве. Проект включает 7000 м буронабивных свай. Производство, начатое 12.04.2019, закончено 01.09.2019. Proje TanımıMulkomonly Housing Project Phase-2 Mühendislik Proje Özellikleri İşveren ANTTEQ Ana Kalemler Буронабивные сваи 7,000 m Proje... -
ЖИЛОЙ КОМПЛЕКС HAVSKAYA
anemptytextlline
24.04.2019 подписан контракт с компанией Bautrans на строительство стены в грунте рамках проекта ЖКХ Хавская в Москве. В рамках проекта с 27.05.2019 по 21.06.2019 было завершено строительство панели диафрагменной стены площадью 3000 м2. Proje TanımıHavskaya Housing Project Mühendislik Proje Özellikleri İşveren Bautrans Ana Kalemler Стена в... -
Проект солнечной электростанции Сакака мощностью 405 МВт
anemptytextlline
Проект солнечной электростанции Сакака мощностью 405 МВт, которая является первой из солнечных электростанций, построенных по всей стране в рамках Национальной программы Саудовской Аравии по возобновляемым источникам энергии, находится в 30 км от города Сакака в регионе Аль-Джуф на севере Саудовской... -
ДЖАБАЛ-АЛЬ-КААБА 3-Й ЭТАП УСТОЙЧИВОСТИ НА СКЛОНЕ
anemptytextlline
Было достигнуто соглашение с инвестиционной фирмой Abdul Latif Jameel Real Estate Investment по проекту 3-й стадии Jabal Al Kaaba в Мекке. В рамках проекта ведется производство анкеров площадью и цементация площадью. Project DescriptionImprovement of Tahliah Madinah Intersection Underpass Engineering Project Features Client Abdul Latif... -
КОМПЛЕКС СЕРДЦЕ СТОЛИЦЫ, ЭТАП 4, ПРОЕКТ
anemptytextlline
После завершения испытаний свай на 4-й очереди проекта «Сердце Столицы», расположенного в Шелепихинском районе, был подписан контракт с Ant Yapı на производство буронабивных свай и грунтовых анкеров в рамках проекта. Проект включает 3900 м буронабивных свай и 1200 м грунтовых анкеров.... -
КУТУЗОВСКИЙ КОМПЛЕКС СТРОИТЕЛЬСТВА ЭТАП 1 И 2
anemptytextlline
28.07.2020 подписан контракт с фирмой Анттек на Кутузовский комплексный проект буронабивных свай в Москве. Проект включает 3 800 м буронабивных свай. Изготовление буронабивных свай осуществляется на стальной платформе. Производство начато 31.07.2020. Остальные производства планируется завершить в июле 2021 года. Project DescriptionKutuzovskiy Complex... -
ПРОЕКТ ЖИЛОЙ КОМПЛЕКС СИМВОЛ
anemptytextlline
14.08.2020 был подписан контракт с Ant Yapı на строительство шпунтового ограждения в рамках проекта комплекса «Символ», который является инвестицией Донстроя в Москве. В рамках проекта построено 5 300 м шпунтового ограждения. Project Descriptionsimvol-complex-project Engineering Project Features Client Ant Yapı Key Quantities Шпунтовое ограждение 5,300 m Project Duration Дата начала 25.08.2020 Дата... -
СТРОИТЕЛЬНЫЕ РАБОТЫ NCMS TOWER
anemptytextlline
Контракт был подписан с Mafaheem Al-E'mar 19.09.2020 на опорные работы по строительству башни в рамках проекта строительства механической системы Национальной компании в Эр-Рияде. В контракт входит производство буросекущихся свай и анкеров. В рамках проекта, который стартовал в октябре 2020 года, к... -
ПРОЕКТ МАСАР ПАКЕТ A-B УСИЛИТЕЛЬНЫЕ РАБОТЫ
anemptytextlline
Проект Масар, строящийся в городе Мекка в Саудовской Аравии, представляет собой мегапроект, целью которого является доставка посетителей, прибывающих на поезде Харамейн, который соединяет Медину-Джидду-Мекку, в Гарем по линии метро. Года с компанией Umm Al Qura for Development & Construction был... -
ПРОЕКТ НАДОРСКОГО ПОРТА
anemptytextlline
После завершения в городе Мекка, Саудовская Аравия, посетители, проезжающие через проезд Харамайн, соединяющий Медина-Джидда-Мекка, достигнут Гарема при помощи метро в Мекке, а также будут проезжать вокруг подземного Гарема. Проект, который включает в себя улучшение 9,5 км дороги, пешеходную дорогу шириной... -
КОНТЕЙНЕРНЫЙ ТЕРМИНАЛ BMT
anemptytextlline
Enka Construction Ltd. для строительства буронабивных свай в рамках проекта многоцелевого терминала и контейнерного месторождения Умм-Каср-Басра в Ираке подписала контракт с Иракским филиалом 27.05.2020. Изготовление буронабивных свай в рамках проекта началось 27.09.2020 г. и планируется завершить к марту 2021 г. Project DescriptionBMT... -
МАSAR ПРОЕКТ СТ-06 СКВАЖИННЫЕ ЗАВОДЫ
anemptytextlline
В рамках проекта MASAR был подписал контракт с Nesma & Partners Contracting на строительство буронабивных свай в скале под фундаментом путепровода, который будет построен на Первой кольцевой дороге в районе ST-06. 850 м буронабивных свай в рамках проекта завершено 15.12.2020. Описание ПроектаMasar... -
Проект круизного порта Принс-Джордж-Уорф в Нассау
anemptytextlline
Правительство Багамских островов решило построить круизный порт на Пристани Джорджа, чтобы увеличить круизный туризм в стране. Проект реконструкции и расширения направлен на увеличение пропускной способности порта и улучшение условий для посетителей. Kasktaş подписал контракт с Багамским филиалом Enka Construction and Development... -
ICITY TOWERS PROJECT
anemptytextlline
ICITY Towers Project is a complex building project consisting of two skyscrapers in the Moscow City region. The contract was signed with MR Group for Piling, Soil Improvement and Excavation Works within the scope of the shoring works of the... -
CSS ПРОЕКТ МЕТРО НОЖНИЧНАЯ КОНСТРУКЦИЯ S21B
anemptytextlline
Строительство линии метро Чекмекёй - Санджактепе - Султанбейли, которая была построена как продолжение проекта метро Ускюдар - Умрание - Чекмекёй, набрало обороты в 2021 году. Был подписан контракт с простым товариществом Doğuş - Yapı Merkezi - Özaltın на работы по... -
FERRERO ЗАВОД ПО ДРОБЛЕНИЮ И СОРТИРОВКЕ ФУНДУКА г. ДЮЗДЖЕ
anemptytextlline
Подписан контракт с Tepe İnşaat на работы по улучшению грунта в рамках строительства завода Ferrero по дроблению и сортировке фундука в г. Дюздже. В рамках проекта производятся Грунтоцементные сваи (DSM), каменные колонны и буронабивные сваи. Помимо этих производств, параллельно с...