This project was designed in order to control and divert storm water towards to the sea. The whole project consists of 8 Packages with 5 Dams and 3 Channels/Drainage and outfalls. The New Drainage system runs at a stretch of 36 kilometers from southeast to northwest of the City of Jeddah diving at a head of 27 meters from the highest point. The secant piling and curtain grouting works were successfully completed.