Jeddah Storm Water Drainage Project

This project was designed in order to control and divert storm water towards to the sea. The whole project consists of 8 Packages with 5 Dams and 3 Channels/Drainage and outfalls. The New Drainage system runs at a stretch of 36 kilometers from southeast to northwest of the City of Jeddah diving at a head of 27 meters from the highest point. The secant piling and curtain grouting works were successfully completed.

Project Description

Jeddah Storm Water Drainage Project, Phase 1

  • Engineering

Project Features

Client
Nesma & Partners
Key Quantities
Secant Pile 12,879 m
Grout Curtain 10,648 m2
Project Duration
Start Date 01.05.2012
Finish Date 01.01.2013
Duration 8 Months

Location

Jeddah, Saudi Arabia

Project Description

Jeddah Storm Water Drainage Project, Phase 2

  • Engineering

Project Features

Client
AL Angari
Key Quantities
Secant Pile 4,120 m
Grout Curtain 6,993  m2
Project Duration
Start Date 01.05.2013
Finish Date 01.09.2013
Duration 4 Months

Location

Jeddah, Saudi Arabia

Project Description

Jeddah Storm Water Drainage Project, Phase 3

  • Engineering

Project Features

Client
China Communication Construction Co
Key Quantities
Secant Pile 4,120 m
Grout Curtain 6,993  m2
Project Duration
Start Date 01.11.2013
Finish Date 01.11.2014
Duration 12 Months

Location

Jeddah, Saudi Arabia

 

 

Gallery

Related Projects

شروع مسار المحطة – 6 لأعمال الخوازيق

شروع مسار...

Asia Completed Projects...
مشروع مسار  الحزمة إيه. – أعمال التدعم

مشروع مسار...

Asia Current Projects...
أعمال تدعيم برج إن سي إم إس

أعمال تدعيم...

Asia Current Projects...
أعمال تثبيت المنحدر في جبل الكعبة – المرحلة 3

أعمال تثبيت...

Asia Current Projects...