- مشروع تأهيل ميناء أكتاوanemptytextllineAktau is Kazakhstan's main port on the Caspian Sea and serves as the major logistics base for the offshore oil fields. The ENKA-Bechtel joint venture signed the contract with Kazakhstan's Ministry of Transportation for the Aktau Port rehabiliation project....
- Jeddah Hilton HotelanemptytextllineLocated on the Corniche Road in Jeddah, this project consists of a hotel building, function hall and apartment blocks constructed between 1995 and 2001. A total of 36,000 m of 100 cm diameter skin and base grouted bored piles...
- Mostar BridgeanemptytextllineThe historical Mostar Bridge collapsed on November 9, 1993 as a result of bombing during the civil war in the former state of Yugoslavia. Reconstruction of the bridge and the historical environment were performed under the supervision of the...
- Poti Port Petroleum Products Storage and Handling Terminal ProjectanemptytextllineThe Poti Sea Port is a major seaport and harbor of the eastern Black Sea coast at the mouth of the Rioni River in Poti, Georgia. 11,000 m Stone Column installation completed successfully by Kasktaş as a subcontractor of...
- Artvin Deriner DamanemptytextllineThe 670 MW Deriner Dam, located on the Çoruh River in the Eastern Black Sea Region, is the largest dam in Turkey and the fifth largest concrete dam in the world with a height of 247 m. Construction of...
- C&WP Topside ProjectanemptytextllineThis project consists of the modernization and strengthening of quayside works; where petroleum platforms will be constructed. Ground improvement by stone column method was implemented under the unloading berth area; where extremely high loads were placed. In addition to...
- Tengiz & Munay Daria ProjectsanemptytextllineA total of 17,000 m reinforced concrete precast driven pile and 27,500 m2 sheet piles were driven by executed by KASKTAŞ.Project DescriptionTengiz & Munay Daria Projects EngineeringProject Features Client Munay Daria Key Quantities R.C. Driven Pile17,000 mSheet Pile27,500 m2 Tie Rods Installation94 no. Project...
- Oued Athmania Dam ProjectanemptytextllineWithin the scope of the Oued Athmania Dam Project in Mila, 11,000 m of 650 mm diameter jet grout columns were performed, within the dam construction works, a total of 35,050 m of drilling for grouting and drainage, 5,300...
- Four Seasons Bosphorus HotelanemptytextllineFor the excavation of foundation excavation pit for the Four Seasons Bosphorus Hotel, located very close to Istanbul Bosphorus, an anchored piled wall shoring system was implemented with a depth of 18 m. In order to provide impermeability of...
- Aramco Rabigh Development ProjectanemptytextllineIn the content of Aramco Rabigh Development Project, a total of 22,000 m bore pile and 51,000 m stone column installation works were successfully completed.Project DescriptionARAMCO Rabigh Development Project EngineeringProject Features Client Consolidated Contractors Company Key Quantities Bored Pile22,000 mStone Column51,000 m Project Duration Start...
- Esentai Park - Tower BuildinganemptytextllineEsentai Park Project covers, soil improvement by using jet grout columns of foundations of the tower; anchor and rock bolt installation works and shotcreting wokrs for the execution of the excavation pit. ENKA was the employer of the project...
- White Square Office Center ProjectanemptytextllineThe White Square Office Center, whose client was the AIG Lincoln-Coalco Partnership, consists of 3 office buildings near the Belaruskaya Subway Station and covers a total construction area of 109,000 m2. A total of 4,700 m of bored pile...
- Mirax PlazaanemptytextllineA total of 11,000 m of bored piles; varying from 1,000-1,200 mm diameter were installed at the Mirax Plaza Project. This project consists of the construction of two high-rise buildings, 41 and 47 stories tall. The piling works began...
- Shakhtar Donetsk StadiumanemptytextllineThe new Stadium, located in Leninsky Komsomol Park, Donetsk, home of FC Shakhtar and is the first stadium in Ukraine to aspire to UEFA and FIFA 5-star status with seating capacity for 50,000 spectators. The project has seen the...
- Jeddah King Abdul Aziz International AirportanemptytextllineThe project, located within King Abdul Aziz Airport area, includes the expansion of existing domestic and international passenger terminals. Bored pile installation works were completed in two different sites, the north and south terminals.Project DescriptionJeddah King Abdul Aziz International...
- Medina Central Area Development ProjectanemptytextllineSince the middle of the 1980s the Prophet’s Mosque (Masjid Al Haram Al Sharif, Masjid An-Nabawi) in Medina has been expanded with the area around the mosque developed by The Medina Central Area Development Project. In accordance with this...
- Tsvetnoy Multifunctional ComplexanemptytextllineIn Tsvetnoy Project, a local subcontractor was started geotechnical works. However, due to the excessive unpredictable displacements encountered, KASKTAŞ was involved in the Project. Within the content of the remedial measures, a total of 550 m steel pipe pile,...
- On-Shore Processing Facility, Sakhalin IslandanemptytextllineOn the northeastern coast of Sakhalin Island in the Russian Federation, a total of 100,000 m of 500-600 mm diameter bored pile and 2,000 m2 of sheet pile wall were executed in three phases at the On-shore Processing Facility...
- Tuzla Sedef ShipyardanemptytextllineIn this project, where the employer is Sedef Gemi İnşaat, a total of 168,000 m Jet Grout Column and 35,000 m Bored Pile were installed in Tuzla Sedef Shipyard between 2005-2008.Project DescriptionTuzla Sedef Shipyard EngineeringProject Features Client Sedef Gemi İnşaat Key Quantities Bored...
- Paveletskaya Underground ComplexanemptytextllinePaveletskaya Square Project is an underground trade center to be built on the Paveletskaya square of Moscow city center. Our company has undertaken the construction of diaphragm wall, bored pile and ground improvement works within the content of the...
- Albanian Motorway ProjectanemptytextllineAlbanian Motorway Project was undertaken by Enka and Bechtel in September, 2006. The Rreshen-Kalimash Motorway Project is a key connection between Durres Port, Albania’s primary harbor on the Adriatic Sea, and Kosovo. The Rreshen-Kalimash motorway’s main purpose is to...
- Algeria Motorway ProjectanemptytextllineThis motorway is a major national project being undertaken by the Algerian government. Traversing the country, the motorway will stretch from the Tunisian border in the east to the Moroccan border in the west, for a total distance of...
- Tula Cement FactoryanemptytextllineThe Tula Cement Plant belonging to Heidelberg Cement was located in Tula, Russia. Under the main contactor Betatek, KASKTAŞ successfully completed a total of 37,000 m of bored piles with various diameter and length. Before execution of piles, a...
- Vyborg Compressor StationanemptytextllineIn the content of Nord Stream Project of Gazprom 6,500 m bored piles constructed. The city of Vyborg was built on a volcanic structure, which makes the project important. Massive granite and granodiorite type rocks were observed throughout the...
- White Garden ProjectanemptytextllineThe White Garden Project, whose client is Ant Yapı, consists of 2 number of office buildings and it was planned as the continuation of the White Square Project. Within the scope of the project, 272 Top Down pile were...
- Al Jawhara Tower ProjectanemptytextllineThe 40-storey Al Jawhara Tower; which is located on the Corniche Road in Jeddah; consists of luxurious penthouses and apartments. A total of 3,600 m, 60 cm and 80 cm diameter secant piles; 10,750 m 90 cm and 120...
- Borusan Gemlİk ProjectsanemptytextllineA total of 21,860 m of bored piles and 17,780 m of DSM Columns were installed at the Bursa Gemlik ERW Pipe Plant of Borusan Mannesmann. Also within the scope of Gemlik Port Facilities Renovation and Consolidation Project 34,000...
- Levent Zorlu ProjectanemptytextllineFour (4) different shoring systems of Zorlu Levent Project with 20 m to 27 m excavation depth were designed by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to surrounding structures...
- Lamar TowersanemptytextllineThe Lamar Towers in Jeddah; which is 50 m away from the Red Sea; consist of two multi functional towers and will be one of the tallest buildings in Jeddah at a 335 m height. The podium structure consists...
- Multi-Purpose Public Buildings in SmolenskayaanemptytextllineDiaphragm wall with a thickness of 600 mm and 1,000 mm diameter top-down bored pile construction works were successfully completed within the scope of the Smolenskaya Multi-Purpose Public Building Project; which consists of a 12-storey shopping center and office...
- İzmit Tüpraş Refinery Upgrading ProjectsanemptytextllineWithin the scope of Izmit Tüpraş Refinery Upgrading Projects, soil improvement works were completed under 5 different Employers. Between 2011 and 2012, a total of 162,000 m Jet Grout, 21,500 m Foundation Piles and 3,800 m Barette Piles were...
- Kashagan Oil Field DevelopmentanemptytextllineThe Kashagan field is located in the Kazakhstan sector of the Caspian Sea and extends over a surface area of approximately 75 kilometers by 45 kilometers. The reservoir lies some 4,200 meters below the shallow waters of the northern part of...
- Metro Bank ProjectanemptytextllineA total of 18,285 m2 Diaphragm Wall, 3,150 m Grout Drilling and 90 m3 Grouting works were completed within the content of the Metrobank, one of the biggest banks of the Russian Federation, Project.Project DescriptionMetro Bank Project EngineeringProject Features Client Alto-Assets Key...
- Ford Otosan Automobile PlantanemptytextllineWithin the scope of Ford Otosan Automobile Factory in Gölcük, bored piles, jet grout columns and stone columns were successfully executed under the foundations of the different strcutures. 13 months after the project started; in other words when 90%...
- Jeddah Storm Water Drainage ProjectanemptytextllineThis project was designed in order to control and divert storm water towards to the sea. The whole project consists of 8 Packages with 5 Dams and 3 Channels/Drainage and outfalls. The New Drainage system runs at a stretch...
- Kuntsevo Multifunctional Trade & Business CenteranemptytextllineKuntsevo Multifunctional Trade & Business Center was built in Moscow with an area of 26,800 m2. The 25 m deep excavation pit was performed by a deep shoring system consisting of 45 m deep and D=80 cm diaphragm wall...
- Metropol Ataşehir Projectanemptytextlline2,650 m Barette piles were constructed within the content of the Metropol Istanbul Project, one of the highest buildings in Europe with a 250-meter skyscraper.Project DescriptionMetropol Ataşehir Project EngineeringProject Features Client Varyap GAP Key Quantities Barette Pile2,650 m Project Duration Start Date01.06.2013Finish Date01.10.2013Duration4 Months LocationIstanbul, Turkey ...
- 4×125 Najybia Gas Turbine Power PlantanemptytextllineNajybia Power Plant Project was successfully completed by ENKA. The project, located near Basrah, is part of a master plan developed and implemented by Republic of Iraq’s Ministry of Electricity to increase the power generation capacity to meet the...
- İzmit Bay Suspension Bridge ProjectanemptytextllineOsman Gazi Bridge ProjectsWithin the scope of the Osman Gazi Bridge Project; 4 different works; such as diaphragm wall works at South Anchorage Block and South Approach Viaducts, sheet pile driving and extracting works at Dry Dock, soil improvement...
- Western High Speed Diameter Motorway ProjectanemptytextllineSt. Petersburg Western High-Speed Diameter Motorway Project is one of the most important public-private partnership (PPP) agreement realized in Russia up to now. Within the scope of the Project a series of bridges combining the islands and a 47 km...
- NEF ProjectsanemptytextllineNEF 163 and NEF 11 Multi Functional Residence and Office Projects were completed in 2011. Within the scope of NEF 163 4,400 m Anchors and 350 m Soil Nails were completed. Within the content of NEF 11 Project 5,500...
- Eroğlu Skyland ProjectanemptytextllineSkyland Project consists of 3 number of tower (Offices, Residences and Hotel) and a shopping with wellness center. This is the deepest excavation project with its 76 m depth supported with anchors not only in Europe but also in...
- Moscow International Business CenteranemptytextllineMoscow City, or the Moscow International Business Center by its full name, is situated four kilometers west of the Kremlin on Krasnopresnenskaya (an embankment of the Moscow River), and is one of the largest and most ambitious construction projects....
- New Ashgabat International AirportanemptytextllineThe new Ashgabat International airport was built to replace existing airport facilities in order to respond to the rapidly growing domestic and international passenger traffic in Turkmenistan. Within the scope of the project, its main contractor was Polimeks, 120,000...
- Eurasia Tunnel - Istanbul Strait Road Tube Crossing ProjectanemptytextllineWithin the scope of Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) that connects Asian and European continents with highway tunnel under seabed for the first time; excavation support systems of temporary structures called as transition boxes and...
- Mecca Holy Haram Development ProjectanemptytextllineThe increasing number of pilgrims, Mecca receives, has necessitated expansion of the Holy Mosque (Al Masjid Al Haram), as well as development projects located in the holy sites and several high-rise tower projects to accommodate the greater influx.Since its...
- İzmir Aliağa Star Refinery Projectsanemptytextllineİzmir Aliağa Star Refinery ProjectsWithin the scope of İzmir Aliağa Refinery Project; which is the largest private sector investment project in Turkey, several sub-contract works have been carried out under different main contractors.Under these subcontracts; Terrace 5&6 Permanent SBMA...
- Alarko Kabataş Construction Site, Shoring Works of NATM, TBM...anemptytextllineWithin the scope of Kabataş-Mecidiyeköy-Mahmutbey Subway Project, shoring works of NATM, TBM and Turnout shaft in Kabataş, Istanbul has been carried out. The excavation depth of these three shafts vary between 43.10 m to 45.4 m and they are...
- Jabal Al Ka’aba Project Phase 2anemptytextllineWithin the scope of Mecca Development Project Phase-1 of Jabal Al Ka'aba Project was completed between 2003 and 2004. Besides slope stability project of the rock stabilization works in Phase 2 of the Jabal Al Ka'aba Project was also...
- Riyadh Metro Project Piling and Shoring WorksanemptytextllineRiyad Metro - Line Number 3Within the content of the Riyad Metro Project, one of the largest construction projects in Saudi Arabia, bored piles with 120 cm and 150 cm diameter in the Western Stretch region viaducts were completed....
- Mahall Bomonti İzmir ProjectanemptytextllineThe Mahall Bomonti İzmir Project under construction is located at Bayraklı region in İzmir. The deep foundation system and shoring design of Mahall Bomonti İzmir Project; which has a maximum 20 m of excavation depth and partially under ground...
- Ferko Line Office and Hotel ProjectanemptytextllineThe shoring design of Ferko Line Project; which has 9 m of excavation depth and partially underground water level was accomplished by KASKTAŞ. In order to perform the excavation in dry condition and safely without causing any hazard to...
- Bahçeşehir University Education Building ProjectanemptytextllineA total of 7000 m2 diaphragm wall and 700 m2 baretta pile was constructed within the scope of Bahçeşehir University Education Building Project, which was started in October 2017. The project site in Besiktas is next the shoring line...
- Michurinsky Bored Pile ProjectanemptytextllineWithin the scope of the Michurinsky residency project in Moscow, 17,400 m of Bored Pile work has been completed.The completed piles have the following properties:After the concrete has been poured into each pile, a precast concrete pile is driven...
- Mandarin Oriental Bosphorus Hotel ProjectanemptytextllineMandarin Oriental Bosphorus Project Shoring and Foundation Works is an ESTA Gayrimenkul investment and the contract has been signed with Yapı Merkezi. Within the scope of the project; there are 21,600 m2 of Diaphragm Wall; 6,000 m of Pre-stressed...
- Shelepihinskaya ProjectanemptytextllineThe contract for the Multifunctional Residence and Facility Complex, located in Moscow, has been signed with ANT YAPI. Within the scope of the project; 8,500 m of Bored Pile with Ø 100-150 cm diameters has been completed. Project DescriptionShelepihinskaya...
- Multi-storey Car Park ProjectanemptytextllineThe contract for the Multi-storey Car Park Project, which is located in MIBC Moscow-City Ring 3 Transportation Road, has been signed with ENKA CONSTRUCTION. Within the scope of the project; 3,500 m of Bored Pile with Ø 62 cm...
- Krasnopresnenskaya ProjectanemptytextllineWithin the scope of the contract signed with OOO BOES CONSTRUCTION for the Multifunctional Complex Project Bored Pile Works; 16,500 m of Bored Pile with Ø 88-100 cm diameters has been completed. The project is located in the Krasnopresnenskaya...
- Filicity ProjectanemptytextllineThe contract of Multifunctional Residence Project Bored Pile Works, signed with ESTA CONSTRUCTION; 11,000 m of Bored Pile with Ø 120 cm diameter has been completed. The project, whose construction is still ongoing, is located in Bagrationovskaya Region, Moscow....
- King Abdulaziz Roadway ProjectanemptytextllineKing Abdulaziz Roadway Project, whose construction is ongoing in the Mecca, Saudi Arabia, consists of the construction of a new bridge that is connected to the Jeddah-Mecca Motorway. Within the scope of the project; 300 m of Bored Pile...
- Çanakkale 1915 Bridge Project / European Anchor Block ExcavationanemptytextllineThe contract of the Çanakkale 1915 Bridge European Anchor Block Excavation Works has been signed with DLSY JV. Within the scope of the project which consists of Kınalı-Tekirdağ-Çanakkale-Savaştepe Highway; there are 5,400 m of Secant Pile; 9,500 m of...
- Iraq Dhi Qar and Samawa Combined Cycle Power Plant...anemptytextllineThe contract of the Iraq Dhi Qar 750 MW Combined Cycle Power Plant Project, which consists of the installation of the bearing foundation pile, has been signed with ENKA CONSTRUCTION. Within the scope of the project; 18,000 m of...
- Maad Hospitality Tower ProjectanemptytextllineThe contract for the Maad Hospitality Tower Project, which will be built in Mecca, Saudi Arabia, has been signed in April 2018. The project consists of the rock bolt and shotcrete works which are executed on the existing slope...
- Dimitrovsky ProjectanemptytextllineThe contract of the MR Group Multifunctional Complex Project Bored Pile Works has been signed with ANTTEQ. The project is ongoing in Dimitrovskiy Region in Moscow. Within the scope of the project, there are 13,000 m of Bored Pile...
- Domodedovo Airport ProjectanemptytextllineWithin the scope of the contract, which consists of the Domodedovo Airport Reconstruction Project in Moscow, signed with ANT YAPI San. ve Tic. A.Ş.; 8,000 m of Bored Pile has been completed as Stage 1 and 2. All installations...
- Çanakkale 1915 Bridge Project / Asian Anchor Block ExcavationanemptytextllineThe contract for the Çanakkale 1915 Bridge Asian Anchor Block Excavation Works, which is in the scope of the Kınalı-Tekirdağ-Çanakkale-Savaştepe Highway Project, has been signed with DLSY JV in August 8th, 2018. Within the scope of the project; there...
- Üsküdar Underground Car ParkanemptytextllineWithin the scope of the contract, which consists of the Hakimiyeti Milliye Bazaar and Underground Car Park Project located in Üsküdar, signed with PLT İnş. San. ve Tic. A.Ş.; there are 15,600 m2 of Diaphragm Wall and 7,000 m...
- Action Development ProjectanemptytextllineWithin the scope of the contract signed with ANT YAPI for the Office and Hotel Project Diaphragm Wall and Top-Down Bored Pile Works; 6,000 m2 of Diaphragm Wall and 2,000 m of Bored Pile works have been completed. The...
- 1915 Canakkale Bridge European Approach Viaduct Ground Treatment And...anemptytextllineFollowing the successful completion of European and Asian Anchor Block excavation support works, the contract for the construction of 365 m long European Approach Viaduct ground treatment and piling works has been signed with the consortium DLSY (Yapı Merkezi-Daelim-SK-Limak).Within...
- Sadoviy Kvartal Deep Excavation Support ProjectanemptytextllineWithin the scope of Stage 3 and 5 construction works of Sadoviy Kvartal Multifunctional Residence with Underground Car Park Project located in Hamovniki Region, which is one of the most prestigious district of Moscow, there are diaphragm wall and...
- Saharova Red 7 Project Foundation Pile WorksanemptytextllineThe contract of the MR Group Multifunctional Complex Project Bored Pile Works has been signed with ANTTEQ. The project is ongoing in Dimitrovskiy Region in Moscow. Within the scope of the project, there are 13,000 m of Bored Pile...
- يو اس تي المسك لأعمال تحسين التربة واللباب والورقanemptytextllineبدأت في عام 1973 مجموعة إلم جروب في إنشاء مجمع صناعة الغابات في منطقة سيبيريا، بمدينة يو اس تي المسك (اوركتسكي اوبلاست) بقرار من مجلس وزراء الاتحاد السوفيتي. توفر إلم جروب 75% من متطلبات السليلوز السنوية للاتحاد السوفيتي وهي...
- مشروع أنابيب مياه طريق الملك عبد العزيز ونهاية امتداد...anemptytextllineتم توقيع عقد أعمال مسامير التربة والخرسانة المرشوشة التي تمنع التشوه الذي يحدث أثناء حفر خط المياه النظيفة 700 مم والذي يغذي الحرم ضمن نطاق مشروع طريق الملك عبد العزيز مع شركة نسما وشركاهم للمقاولات المحدودة في 9 يوليو...
- مشروع مخرج الرياض 10anemptytextllineتقوم الشركة السعودية للمشاريع الترفيهية، قام بتأسيسها الصندوق العام السعودي عام 2017، ببناء مجالات النشاط الاجتماعي في جميع أنحاء الدولة. تم توقيع عقد إنشاءات مسامير التربة والخرسانة المرشوشة ضمن نطاق مشروع مخرج الرياض 10 سلسلة المشاريع الترفيهية، وهو أحد...
- مشروع طريق الملك عبد العزيز نهاية امتداد 4anemptytextllineتم توقيع عقد إنهاء أعمال التدعيم لامتداد 4 ضمن نطاق مشروع طريق الملك عبد العزيز مع شركة نسما وشركاه للمقاولات في 21 مايو 2019. ولقرب المشروع من الحرم وموقع خط تدفق مياه زمزم بداخله في موقع المشروع، تم طلب...
- مشروع إنشاء محطات تحلية المياه بالأقمار الصناعية، محطة حقلanemptytextllineضمن نطاق مشروع إنشاء محطات تحلية المياه بالأقمار الصناعية، تهدف وزارة البيئة في المملكة العربية السعودية إلى بناء 8 محطات لتحلية المياه على شاطئ البحر الأحمر. تم توقيع عقد إنشاء الخوازيق القاطعة في نطاق محطة حقل مع شركة بيكس...
- مشروع مدينة الملك عبدالله الاقتصادية لتحلية المياه بالطاقة الشمسيةanemptytextllineتوفير المياه لمدينة الملك عبد الله الاقتصادية؛ والتي تقع على ساحل البحر الأحمر، والتي سيتم دعمها بمحطة تحلية المياه بالطاقة الشمسية بقدرة تحلية 30.000 متر مكعب من مياه البحر للاستخدام المحلي في المدينة. تم توقيع عقد أعمال الخوازيق القاطعة...
- مشروع إنشاء محطات تحلية المياه بالأقمار الصناعية، محطة أملجanemptytextllineتهدف وزارة البيئة في المملكة العربية السعودية ضمن نطاق مشروع إنشاء محطات تحلية الأقمار الصناعية، إلى بناء 8 محطات لتحلية المياه على شاطئ البحر الأحمر. ومحطة أملج هي واحدة من هذه المحطات الثمانية ولديها القدرة على تحلية 18000 متر...
- مشروع فندق بلغاريanemptytextllineتم توقيع عقد أعمال الخوازيق القاطعة والركائز من أعلى إلى أسفل ضمن نطاق مشروع فندق بلغاري، الكائن في موسكو مع شركة أنتيك في 11 أكتوبر 2019. يشمل المشروع 7500 من الخوازيق القاطعة و 2400 متر من أعلى إلى أسفل....
- مبنى مجمع سيرتدتسر ستوليتس متعدد الوظائف المرحلة – 2anemptytextllineتم توقيع عقد حفر الخوازيق وأنبوب الخوازيق والركيزة ضمن نطاق مشروع مبنى مجمع سيرتدتسر ستوليتس متعدد الوظائف، الكائن في شارع شيلفسكاويا، موسكو، مع آنت يابي في 24 أبريل 2019. ويوجد ضمن نطاق المشروع 2300 متر من حفر الخوازيق؛ و...
- مشروع مولكومنلي للاسكان المرحلة - 2anemptytextllineيقع عقد أعمال حفر الخوازيق ضمن نطاق مشروع مولكومنلي للإسكان - المرحلة 2، في موسكو وهو استثمار لمجموعة كابيتال جروب، والذي تم توقيعه مع أنتيك في 8 أبريل 2019. يتضمن المشروع 7000 متر من أعمال حفر الخوازيق. بدأت أعمال...
- مشروع هافسكايا للاسكانanemptytextllineتم توقيع عقد أعمال الجدار الحاجز ضمن نطاق مشروع هافسكايا للإسكان، الكائن في موسكو، مع بوترانز في 24 أبريل 2019. تم إنجاز الجدار الحاجز بمساحة 3000 متر مربع بين 27 مايو و 21 يونيو 2019.العميل: بوترانزProje TanımıHavskaya Housing Project...
- مشروع مجمع ألسوفيسكي متعدد الوظائفanemptytextllineمشروع مجمع ألسوفيسكي متعدد الوظائفتم توقيع عقد أعمال حفر الخوازيق ضمن نطاق مشروع مجمع ألسوفيسكي متعدد الوظائف الكائن في موسكو، مع أنتيك بتاريخ 25 مارس 2019. بدأ تنفيذ حفر الخوازيق بطول 1600 متر في 10 أبريل 2019 وانتهى في...
- مشروع سكاكا الكهروضوئي المستقل 405 ميجاواتanemptytextllineحيث أنه أول مشروع للطاقة المتجددة في إطار البرنامج الوطني للطاقة المتجددة، يقع مشروع سكاكا 405 ميجاوات على بعد 30 كم خارج مدينة سكاكا في منطقة الجوف ويغطي مساحة 6 كيلومتر مربع. وعند انجازه سوف يزود المشروع 45000 أسرة...
- أعمال تثبيت المنحدر في جبل الكعبة - المرحلة 3anemptytextllineتم توقيع العقد مع شركة عبد اللطيف جميل للاستثمار العقاري لمشروع جبل الكعبة المرحلة الكائن في مكة المكرمة. يوجد ضمن نطاق المشروع 3100 متر من مسامير الصخور و 2125 متر مربع من أعمال الخرسانة المرشوشة.بدأت أعمال تثبيت المنحدر في...
- مبنى مجمع سيردتس ستويلتس متعدد الوظائف المرحلة – 4anemptytextllineبعد إنجاز أعمال اختبار الخوازيق لمشروع سيردتس ستويلتس المرحلة – 4، الكائن في شيلفنسكايا، م توقيع عقد مع آنت يابي لأعمال حفر الخوازيق والركائز.يشمل نطاق المشروع 3900 م من الخوازيق و 1200 م من أعمال الركائز. تم الانتهاء من...
- مشروع مجمع كوتوفسكي - المراحل 1 و 2anemptytextllineتم توقيع عقد أعمال الخوازيق ضمن نطاق مشروع مجمع كوتوفسكي الكائن في مدينة موسكو، مع آنتيك في 28 يوليو 2020. يشمل المشروع 3800 متر من الخوازيق.يتم تنفيذ الخوازيق على منصة من الحديد. بدأت عمليات التنفيذ في 31 يوليو 2020....
- مشروع مجمع سيمفولanemptytextllineتم توقيع العقد في 14 أغسطس 2020 مع آنت يابي لأعمال أنابيب الخوازيق في نطاق مشروع مجمع سيمفول، وهو استثمار دونستروف في موسكو. تم الانتهاء من 5,300 م من أعمال أنابيب الخوازيق ضمن نطاق المشروع.العميل: آنت يابيProject Descriptionsimvol-complex-project EngineeringProject...
- أعمال تدعيم برج إن سي إم إسanemptytextllineتم توقيع العقد في 19 سبتمبر 2020 مع مفاهيم الإعمار لأعمال تدعيم مبنى البرج ضمن نطاق مبنى الشركة الوطنية لمشروع النظام الميكانيكي، الكائن في الرياض. يتكون العقد من أعمال الخوازيق القاطعة وأعمال الركائز.بالنسبة للمشروع الذي بدأ في أكتوبر 2020؛...
- مشروع مسار الحزمة إيه. – أعمال التدعمanemptytextllineيهدف المشروع إلى تمكين الزوار القادمين بقطار الحرمين الذي يربط المدينة المنورة-جدة - مكة المكرمة، من الوصول إلى الحرم من خلال نظام المترو في مكة المكرمة. يتكون المشروع من طريق طوله 9.5 كيلومتر وسيأخذ حركة المرور حول مترو أنفاق...
- مشروع ميناء الناظورanemptytextllineتم توقيع العقد في 28 مارس 2020 مع إس إس إن SSN (STE STFA SGTM NADOR S.A.) لأعمال الجدار الحاجز والخوازيق في مشروع ميناء الناظور قيد الإنشاء في المغرب. يتكون المشروع من 13.900 متر مربع من الجدار الحاجز و...
- محطة حاوية بي إم تيanemptytextllineتم توقيع العقد مع شركة إنكا كونستركشن لمتيد فرع العراق في 27 مايو 2020 لإنشاء الخوازيق ضمن نطاق ساحة محطة الحاويات متعددة الأغراض في ميناء أم قصر البصرة الواقعة في العراق.بدأ بناء الخوازيق في 27 سبتمبر 2020 ومن المقرر...
- شروع مسار المحطة - 6 لأعمال الخوازيقanemptytextllineم توقيع العقد مع شركة نسما وشركاهم للمقاولات المحدودة لتنفيذ الخوازيق الصخرية تحت أساس الجسر الذي سيتم بناؤه على الطريق الدائري الأول الكائن في منطقة المحطة – 6 ضمن نطاق مشروع مسار.تم الانتهاء من 850 م من الركائز داخل...