Within the scope of Mecca Development Project Phase-1 of Jabal Al Ka’aba Project was completed between 2003 and 2004. Besides slope stability project of the rock stabilization works in Phase 2 of the Jabal Al Ka’aba Project was also designed and carried out by Kasktaş. The project consists of permanent rock anchors, rock bolt and shotcreting works. Before commencement of the works, a number of anchor proof tests were carried out to verify the anchor loads.

Project Description

Jabal Al Ka’aba Project Phase 2

  • Engineering

Project Features

Client
Abdul Latif Jameel Real Estate
Key Quantities
Rock Bolt 12,436 m
Shotcrete 10,111 m2
Rock Anchor 12,764 m
Project Duration
Start Date 10.09.2014
Finish Date Ongoing Project
Duration Ongoing Project

Location

Mecca, Saudi Arabia

 

 

Gallery

Related Projects

شروع مسار المحطة – 6 لأعمال الخوازيق

شروع مسار...

Asia Completed Projects...
مشروع مسار

مشروع مسار

Asia Completed Projects...
أعمال تدعيم برج إن سي إم إس

أعمال تدعيم...

Asia Completed Projects...
أعمال تثبيت المنحدر في جبل الكعبة – المرحلة 3

أعمال تثبيت...

Asia Completed Projects...