Within the scope of Mecca Development Project Phase-1 of Jabal Al Ka’aba Project was completed between 2003 and 2004. Besides slope stability project of the rock stabilization works in Phase 2 of the Jabal Al Ka’aba Project was also designed and carried out by Kasktaş. The project consists of permanent rock anchors, rock bolt and shotcreting works. Before commencement of the works, a number of anchor proof tests were carried out to verify the anchor loads.
Project Description
Jabal Al Ka’aba Project Phase 2
- Engineering
Project Features
Client
Abdul Latif Jameel Real Estate
Key Quantities
Rock Bolt | 12,436 m |
Shotcrete | 10,111 m2 |
Rock Anchor | 12,764 m |
Project Duration
Start Date | 10.09.2014 |
Finish Date | Ongoing Project |
Duration | Ongoing Project |
Location
Mecca, Saudi Arabia