This project consists of the modernization and strengthening of quayside works; where petroleum platforms will be constructed. Ground improvement by stone column method was implemented under the unloading berth area; where extremely high loads were placed. In addition to 10,000 m of 820 mm diameter vertical and raked steel pipe piles, a total of 122,000 m of 800 to 1,000 mm diameter stone columns were installed by vibroreplacement technique.
Project Description
C&WP Topside Project
- Engineering
Project Features
Client
Tekfen Construction
Key Quantities
Stone Column (with Vibroreplacement Technique) | 122,000 m |
Vertical and Raked Steel Pipe Pile (Vibrocompaction by Vibroflotation Technique) | 10,000 m |
Project Duration
Start Date | 01.02.2003 |
Finish Date | 01.01.2004 |
Duration | 11 Months |
Location
Baku, Azerbaijan