Kuntsevo Multifunctional Trade & Business Center was built in Moscow with an area of 26,800 m2. The 25 m deep excavation pit was performed by a deep shoring system consisting of 45 m deep and D=80 cm diaphragm wall supported with 6 levels of pre stressed temporary ground anchors. In accordance to the preliminary shoring design, the anchor loads were calculated as 600 kN. Based on the results of pilot test anchors and groutability tests; which were installed by using traditional methods did not carry the target anchor loads, therefore an alternative technique; Single Bore Multiple Anchor (SBMA); KASKTAŞ’ registered product in Russia; was implemented. Additional pilot test anchors showed that SBMA anchors can successfully carry 90 ton. Finally 83,500 m of SBMA anchors; consisting of 6 nos 0.5″ diameter strand with a length of 18 to 30 meters were installed. The production of the anchors was carried out at a closed manufacturing plant established on the construction site. The systems used in this closed plant and the selected anchor materials made it possible to produce the high quality anchors.