The contract of the Iraq Dhi Qar 750 MW Combined Cycle Power Plant Project, which consists of the installation of the bearing foundation pile, has been signed with ENKA CONSTRUCTION. Within the scope of the project; 18,000 m of Bored Pile has been completed.
In addition, Kasktaş provides supervisor service on Geotechnical works for the Iraq Samawa 750 KW Combined Cycle Power Plant Project, which is also carried by ENKA CONSTRUCTION. Within the scope of the project; there is 70,000 m of Bored Pile.
Project Description
Dhi Qar and Samawa Combined Cycle Power Plant Project
- Engineering
Project Features
Client
ENKA
Key Quantities
Bored Pile | 88,000 m |
Project Duration
Start Date | 20.01.2018 |
Finish Date | Current |
Duration |
Location
Basra, Iraq