The contract of the Iraq Dhi Qar 750 MW Combined Cycle Power Plant Project, consisting of the installation of the foundation pile, was signed with Enka Construction. Within the scope of the project; 18,000 m of Bored Pile was completed.
In addition, Kasktaş provided supervisor service on Geotechnical works for the Iraq Samawa 750 MW Combined Cycle Power Plant Project, which was also carried out by Enka Construction. Within the scope of the project; there is 69,000 m of Bored Pile work.
Project Description
Dhi Qar and Samawa Combined Cycle Power Plant Project
- Engineering
Project Features
Client
ENKA
Key Quantities
Bored Pile | 18,000 m |
Project Duration
Start Date | 20.01.2018 |
Finish Date | 01.05.2020 |
Duration | 29 months |
Location
Basra, Iraq