The contract was signed with Enka Construction Ltd. Iraq Branch on May 27, 2020 for the Bored Pile constructions within the scope of the Port of Umm Qasr Basra Multi-Purpose Container Terminal Yard, located in Iraq. Within the scope of the project, there is 4,300 m of Bored Pile.
Project Description
BMT Container Terminal
- Engineering
 
Project Features
Client
					Enka Construction Ltd. Iraq Branch
				
			Key Quantities
| Bored Pile | 4,300 m | 
Project Duration
| Start Date | 27.09.2020 | 
| Finish Date | 01.04.2021 | 
| Duration | 7 months | 
Location
Iraq