For the excavation of foundation excavation pit for the Four Seasons Bosphorus Hotel, located very close to Istanbul Bosphorus, an anchored piled wall shoring system was implemented with a depth of 18 m. In order to provide impermeability of shoring system along the seaside and in order to improve the subsoil under the foundation, jet grout columns with a total length of 32,000 m and a diameter of 60-80 cm diameter were installed.

Project Description

Four Seasons Bosphorus Hotel

  • Engineering

Project Features

Client
Atik Pasha Turizm A.Ş.
Key Quantities
Jet Grout Column32,000 m
Anchor17,000 m
Bored Pile3,200 m
Mini Pile5,900 m
Project Duration
Start Date01.08.2005
Finish Date01.08.2006
Duration12 Months

Location

Istanbul, Turkey
[wpgmappity id=”24″]

 

 

Gallery

Related Projects

MBE METRO PROJECT TOKİ STATION SHORING WORKS

MBE METRO PROJECT TOKİ STATION SHORING WORKS

Completed Projects Deep Excavations Deep Foundations...
FERRERO DÜZCE NUT CRACKING AND SELECTION FACILITY

FERRERO DÜZCE NUT CRACKING AND SELECTION FACILITY

Completed Projects Deep Foundations Soil Improvement...
CSS METRO PROJECT S21B SWITCH STRUCTURE

CSS METRO PROJECT S21B SWITCH STRUCTURE

Completed Projects Deep Excavations Turkey
1915 Canakkale Bridge European Approach Viaduct Ground Treatment And Pile Works

1915 Canakkale Bridge European Approach Viaduct Ground Treatment...

Completed Projects Deep Excavations Soil Improvement...