For the excavation of foundation excavation pit for the Four Seasons Bosphorus Hotel, located very close to Istanbul Bosphorus, an anchored piled wall shoring system was implemented with a depth of 18 m. In order to provide impermeability of shoring system along the seaside and in order to improve the subsoil under the foundation, jet grout columns with a total length of 32,000 m and a diameter of 60-80 cm diameter were installed.

Project Description

Four Seasons Bosphorus Hotel

  • Engineering

Project Features

Client
Atik Pasha Turizm A.Ş.
Key Quantities
Jet Grout Column 32,000 m
Anchor 17,000 m
Bored Pile 3,200 m
Mini Pile 5,900 m
Project Duration
Start Date 01.08.2005
Finish Date 01.08.2006
Duration 12 Months

Location

Istanbul, Turkey

 

 

Gallery

Related Projects

MBE METRO PROJECT TOKİ STATION SHORING WORKS

MBE METRO PROJECT...

Completed Projects Deep...
FERRERO DÜZCE NUT CRACKING AND SELECTION FACILITY

FERRERO DÜZCE NUT...

Completed Projects Deep...
CSS METRO PROJECT S21B SWITCH STRUCTURE

CSS METRO PROJECT...

Completed Projects Deep...
1915 Canakkale Bridge European Approach Viaduct Ground Treatment And Pile Works

1915 Canakkale Bridge...

Completed Projects Deep...