Special Applications

FINAL EXCAVATION LEVEL HAS BEEN REACHED at the MANDARIN ORIENTAL BOSPHORUS HOTEL PROJECT

FINAL EXCAVATION LEVEL HAS BEEN REACHED at the MANDARIN ORIENTAL BOSPHORUS HOTEL PROJECT

Learn more
Drilling works have commenced at 405 MW Sakaka Photovoltaik Independent Power Project

Drilling works have commenced at 405 MW Sakaka Photovoltaik Independent Power Project

Being the first renewable energy project under national renewable energy program, 405 MW Sakaka PV IPP is located 30 km outside of Sakaka City in Al Jouf Region and will cover an area of 6 square kilometres. Upon completion, the Continue reading
Learn more
Dmitrovka Project

Dmitrovka Project

Within the scope of the D1 Residence Project, located in the Dmitrovka Region, Moscow, 248 no. of Dia.: 1200 mm and 38 to 42 m long foundation piles have been designed. Following the installation of 20 no. of test piles Continue reading
Learn more
Üsküdar Hakimiyeti Milliye Bazaar and Underground Car Park Project  Shoring and Top-down Pile Works

Üsküdar Hakimiyeti Milliye Bazaar and Underground Car Park Project Shoring and Top-down Pile Works

The construction of diaphragm wall within the scope of Üsküdar Hakimiyeti Milliye Bazaar and Underground Parking Project; consisting of 874 car parks and 136 independent commercial areas has been completed last week whereas construction of top-down piles still continues. For Continue reading
Learn more
1915 ÇANAKKALE BRIDGE ASIAN ANCHOR BLOCK EXCAVATION SUPPORT AND BARRETTE PILE WORKS

1915 ÇANAKKALE BRIDGE ASIAN ANCHOR BLOCK EXCAVATION SUPPORT AND BARRETTE PILE WORKS

Following the completion of 1915 Çanakkale Bridge European Anchor Block Excavation and Support Works, Asian Anchor Block excavation support and barrette pile installation works have been started. Within the scope of the project; where excavation depth is maximum 6m, a Continue reading
Learn more
1915 ÇANAKKALE BRIDGE EUROPEAN ANCHOR BLOCK EXCAVATION AND SUPPORT WORKS

1915 ÇANAKKALE BRIDGE EUROPEAN ANCHOR BLOCK EXCAVATION AND SUPPORT WORKS

The excavation works of the reinforced concrete anchor block structure on the European side of the 1915 Çanakkale Bridge, with a volume of 68,000 m³, started in May 2018. Within the content of the European Anchor Block Project, with a Continue reading
Learn more
MAAD HOSPITALITY TOWERS SLOPE STABILIZATION PROJECT

MAAD HOSPITALITY TOWERS SLOPE STABILIZATION PROJECT

The execution of permanent rock bolts and shotcrete works under the Maad Hospitality Towers Project, which was signed in April 2018, continues at full speed. Within the scope of the project, a total of 24,055 m rock bolt and 21,300 Continue reading
Learn more
Mahall Bomonti İzmir Project completed successfully.

Mahall Bomonti İzmir Project completed successfully.

Mahall Bomonti İzmir Project, which started in July 2016, completed as of December 2017. A total of 27706 m3 barrette pile, 19814 m. bored pile, 27211 m2 diaphragm wall and 50704 m of SBMA anchors were successfully completed within the Continue reading
Learn more
The Deepest Barrette Pile in Turkey Has Been Completed

The Deepest Barrette Pile in Turkey Has Been Completed

The deepest barrette pile construction in Turkey has been successfully accomplished within the scope of on-going Mahall Bomonti İzmir Project. A piled-raft foundation; consisting of “barette piles” (rectangular pile) is designed by KASKTAŞ. The piled-raft foundation is selected as the Continue reading
Learn more
High Capacity Single Bore Multiple Anchor (SBMA) Technology

High Capacity Single Bore Multiple Anchor (SBMA) Technology

In the content of Ferko Line Office and Otel Project the highest capacity ground anchors were successfully completed in very soft to soft soil conditions at Kağıthane, Istanbul,  an anchor capacity of 120 ton was achieved. Moreover, this project will Continue reading
Learn more