Located on the Corniche Road in Jeddah, this project consists of a hotel building, function hall and apartment blocks constructed between 1995 and 2001. A total of 36,000 m of 100 cm diameter skin and base grouted bored piles were installed to transfer the building loads to the dense coral formation. Probing was performed in order to search for cavities under each pile and when a cavity was encountered during probing, it was filled with grouting. A detailed quality control program was implemented due to the subsoil conditions consisting of erratic and heterogeneous structure of the coralline limestone formations.
Project Description
Hilton Hotel Jeddah
- Engineering
Project Features
Client
Haif Trading and Construction
Key Quantities
Skin and Base Grouted Bored Pile, Cavity Probing and Cavity Grouting | 36,000 m |
Project Duration
Start Date | 01.10.1995 |
Finish Date | 01.09.1997 |
Duration | 23 Months |
Location
Jeddah, Saudi Arabia