This project consists of the modernization and strengthening of quayside works; where petroleum platforms will be constructed. Ground improvement by stone column method was implemented under the unloading berth area; where extremely high loads were placed. In addition to 10,000 m of 820 mm diameter vertical and raked steel pipe piles, a total of 122,000 m of 800 to 1,000 mm diameter stone columns were installed by vibroreplacement technique.

Project Description

C&WP Topside Project

  • Engineering

Project Features

Client
Tekfen Construction
Key Quantities
Stone Column (with Vibroreplacement Technique)122,000 m
Vertical and Raked Steel Pipe Pile (Vibrocompaction by Vibroflotation Technique)10,000 m
Project Duration
Start Date01.02.2003
Finish Date01.01.2004
Duration11 Months

Location

Baku, Azerbaijan

 

 

Gallery

Related Projects

Masar Project ST 06 Bored Pile Works

Masar Project ST...

Completed Projects Deep...
MASAR PROJECT PACKAGE A-B SHORING WORKS

MASAR PROJECT PACKAGE...

Asia Completed Projects...
NCMS TOWERS PROJECT

NCMS TOWERS PROJECT

Asia Completed Projects...
Jabal Al Ka’Aba Phase 3 Slope Stabilization Works

Jabal Al Ka’Aba...

Asia Completed Projects...